Erasmus MC redevelopment enters next phase with Emergency Department opening

The Erasmus MC, which is undergoing a major redevelopment until 2017, is one of the university hospitals in the centre of a major city. The new buildings will further strengthen its ties with the heart of Rotterdam, including through a city-facing main entrance and, since October 2014, a new Emergency Department on the city side. The entrance to the new department is at street level, between the entrance on Wytemaweg and the future main entrance. “Thanks to the carefully planned logistics and human scale, there is a sense of calm here, for both patients and staff.”

The new Emergency Department (ED) at Erasmus MC offers logistical advantages beyond good external accessibility. The department is located precisely between the inpatient wards at Erasmus MC and those at Sophia Children’s Hospital. The adult Emergency Department and the children’s Acute Care department have been working together at one site since October 2014. “We are building a new Erasmus MC in a structured, phased manner. This means that departments from existing buildings have already moved into the new buildings, allowing demolition and construction at the relevant locations to proceed according to schedule,” says Liesbeth van Heel, redevelopment project secretary. “The shell of the new Emergency Department had been ready for some time and was initially used for the laboratories’ ‘internal move’. Since early October, the ED has been permanently located in the heart of the new buildings, with good horizontal and vertical connections between all parts of the new and existing hospital.”

Integrating acute care
Once the redevelopment is complete, acute care will be extensively integrated. In 2017, the new operating theatre complex will open directly above the ED, along with interventional radiology and the ICU, all connected by the same direct lift link. The trauma helicopter, which lands on the existing helipad, already has a direct bridge and lift connection to the Emergency Department. Alongside the opening of the ED, another important step is being taken: separate ambulance routes for emergency and elective care, which will greatly reduce congestion in the ambulance bay. “The logistics are working like clockwork,” says Willemineke Hammer, architect and partner at EGM architecten. “The new-build programme is on schedule, and thanks in part to the timely handovers of individual sections, the acute care backbone, including the ED, is already largely operational. The shell of the new department had to be completed on time, of course, as it is on the lower floors of East, the building section that opened in January 2013. This allowed us to devote considerable attention to coordinating and fitting out the ED.”

Highly specialised care
The Emergency Department at Erasmus MC is used intensively. “We treat around 30,000 patients a year,” continues Jos de Bruijn, who was directly involved in the move to the new location as head of the Emergency Department unit. “In addition to everyday emergency care, Erasmus MC has highly specialised responsibilities in chemical disaster response and the treatment of infectious diseases. The new ED also houses an emergency dental clinic, for example. Understandably, considerable attention had to be paid to dedicated rooms and the associated routes. Testing, moving and integrating teams also had to take place alongside a busy daily schedule. On the other hand, improvisation is second nature in the Emergency Department. The move therefore went smoothly. The department’s good location within the building immediately gives things a boost. The atmosphere also plays a part: the new location feels much more spacious.

Thanks to the carefully planned logistics and the human scale of EGM’s architecture, there is a sense of calm here, for patients and their companions as well as staff. There have been no incidents since the new waiting area opened.”

Separating children and adults
The human scale is central to the redeveloped Erasmus MC. “The Emergency Department, where everything a hospital does comes together, is no exception,” says Hammer. “It overlooks the light-filled internal atrium with its greenery, while the sky ceiling (a light well; ed.) brings extra daylight into the central waiting area. We also tailor the colours and fit-out to each department.” A low-stimulation environment is a priority in the Emergency Department, as is physical separation between clinical care and office facilities. Separate waiting areas have also been created for adults and children. De Bruijn says: “In day-to-day practice, the separate layout shields children from the hectic pace of adult emergency care. The spaces have nevertheless been designed to remain flexible in the event of an emergency, partly because of the highly specialised responsibilities mentioned earlier. The treatment areas can therefore be switched between uses when necessary.” Van Heel adds: “Opening the new Emergency Department marks a major step towards final completion.”

facts & figures
Project: Erasmus MC redevelopment, Rotterdam
Client: Erasmus MC, Rotterdam
Architect: EGM architecten, Dordrecht
Contractor: Bouwcombinatie Nieuwbouw Erasmus MC (BAM Utiliteitsbouw BV, Grote Projecten & Ballast Nedam Bouw & Ontwikkeling, Speciale Projecten)
ED opening: October 2014
ED programme: 3,200 m² (including 22 treatment rooms, 4 bed rooms and 3 trauma rooms)

Question about this story? Ask your question

Who worked on Erasmus MC

  1. architectEGM ArchitectenMentioned in Suppliers to hospitals: nora rubber flooring at Erasmus MC
  2. rubber floor coveringsnoraMentioned in Suppliers to hospitals: nora rubber flooring at Erasmus MC
  3. clientErasmus MC, RotterdamIn this story
  4. contractorBAM Utiliteitsbouw BV: Grote ProjectenIn this story
  5. contractorBallast Nedam Bouw & Ontwikkeling: Speciale ProjectenIn this story
  6. design teamscepezedMentioned in structural design for new Erasmus MC building completed
  7. design teamsVakwerk ArchitectenMentioned in structural design for new Erasmus MC building completed
  8. building servicesArcadisMentioned in structural design for new Erasmus MC building completed
  9. constructionAronsohnMentioned in structural design for new Erasmus MC building completed
  10. building physics consultancyDeernsMentioned in structural design for new Erasmus MC building completed
  11. sustainabilityHaskoningMentioned in structural design for new Erasmus MC building completed
  12. vibrationsPeutzMentioned in structural design for new Erasmus MC building completed
  13. laboratory fit-outLab-DsignMentioned in structural design for new Erasmus MC building completed

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectErasmus MC
  • ThemeHospital construction and refurbishment
  • SubjectHospitals
  • CompanyErasmus MC, Rotterdam
  • CompanyBAM Utiliteitsbouw BV – Grote Projecten
  • CompanyBallast Nedam Bouw & Ontwikkeling – Speciale Projecten
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.