Hospitals

Furniture for an entire hospital

Furniture for an entire hospital

Tailored to each space

A major new main building for Radboudumc, with its complex spatial programme, calls for an extensive furniture plan. Above all, the plan needs to complement the architectural design by EGM and the interior design by Suzanne Holtz, with the green themes and seasonal colours carried through on each floor. “It really does involve thousands of pieces of furniture and interior elements. We spent a year and a half working on this fit-out programme,” says Nelleke Lagerwerf, interior architect at Gispen.  

Offices, patient rooms, consultation and examination rooms, lounges and a library: Gispen supplied the furniture for almost every space in Radboudumc’s new main building. “It was a complex task, but we have experience furnishing large hospitals and healthcare institutions. That means we can communicate effectively with healthcare professionals about their furniture needs. We also work well with EGM, design manager Iris Hobo and the project office. Hospital projects call for quite specific knowledge of ergonomics and occupational health and safety, and we have that in-house. What’s more, design is our expertise.”

Atmospheres

Lagerwerf and the Gispen team had a strong framework to guide their product selection. “The building has been designed around a series of atmospheres, starting on the lower floors with aquatic plants and culminating on the top floors in the tree canopy. On each floor, we were able to draw on the four seasons, translated into blue, green, lilac and orange tones for winter, spring, summer and autumn respectively. You can see this in the wall paint, the carpets and, of course, our furniture. Usually, you match a local colour and atmosphere with a corresponding look and feel. You can do that through colour, but also through materials. In some areas, we chose furniture in neutral colours that works anywhere. For the offices, for example, we created workstations with wooden desks, white cabinets and planters, while white furniture also features in several lounges. What matters is that the end result works, and looks like a single building, with no visible signs that several parties have worked on it.”

Room schedule

The furniture not only fits seamlessly into the architectural whole of the new main building, it also needs to meet all occupational health and safety and ergonomic requirements. Lagerwerf explains: “Based on EGM’s drawings and the wishes of all the users, we drew all the furniture to scale and assigned it a code. Our extensive experience in healthcare is naturally a great asset here. At this stage, you are already considering dimensions, whether or not to include armrests, backrest height and other occupational health and safety and ergonomic variables. We then select the colours and materials to create the right look and feel. We do this for each room. We compile all this information in a room schedule, from which it is easy to extract summaries and which allows us to carry out a thorough, systematic check before final approval. For users, it is also a practical document for keeping track of the entire inventory.”

A few months after the official opening, Lagerwerf says the initial reactions have been very positive. “I think that, together with EGM, Suzanne Holtz, Iris Hobo and the project office, we have succeeded in creating a unified interior with the right feel, in keeping with the wishes of patients and staff.”      

www.gispen.com

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeHospital construction and refurbishment
  • SubjectHospitals
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.