Hybrid operating theatre at Groene Hart Ziekenhuis
Text Tjerk van DuinenImage Groene Hart Ziekenhuis, GHZ, Aryan Jansen

Building on a (small) postage stamp
Treating an aneurysm is now incredibly quick. Whereas patients used to occupy a hospital bed for ten days, they now stay for no more than one, and soon the procedure may even be performed as a day case. Building a new operating theatre is also quicker these days than it used to be, at least that was the experience at Groene Hart Ziekenhuis (GHZ) in Gouda. The first pile was driven into the ground in a courtyard at the complex in April 2023, and the first vascular operation took place on 4 September 2024. It all comes down to meticulous planning, close coordination with neighbouring departments, using proven technology and working with established construction partners.

The new hybrid operating theatre occupies a special location in the 40 by 14 metre courtyard next to the restaurant. “This means the new facility connects to the existing operating theatre complex on the second floor, which houses eight standard operating theatres,” says Josbert Kamerbeek, Project Manager at the GHZ Construction Office. “All the existing facilities, such as the holding and recovery areas, are therefore close at hand for the new operating theatre. The operating theatre itself is on the second floor, with all the plant housed on the roof level. The interesting thing is that from the outside you really cannot tell it is new, because the existing façade design has been replicated exactly.”

Growth forecast
The hybrid operating theatre was initially designed to combine vascular surgery and interventional radiology. “GHZ is a regional hospital that is still growing, because Gouda is a growing municipality with a lot of new housing,” says Peter Schlejen, a vascular surgeon at GHZ since 2011. “Add an ageing population and a sustained increase in diseases such as diabetes, and you can be certain that the number of vascular surgery patients will grow substantially. We therefore need more capacity in this area, and we need to keep innovating. One way we are doing this is by bringing vascular surgery and interventional radiology together in this hybrid operating theatre. This allows us to combine two disciplines that would otherwise have to be carried out in stages. And if you can perform two treatments in one go, patients need to come to hospital less often and the risk of complications is reduced. In effect, it is a catheterisation lab in an operating theatre, with all the facilities, including recovery, available.”

Table and C-arm
The new operating theatre measures 7 by 10 metres and is designed with a focus on vascular surgery and interventional radiology. Schlejen: “The C-arm and the free-floating table are central to the room. The C-arm takes X-rays and 3D images from every angle and can image a patient’s entire body during a procedure. The C-arm and table are linked, so the C-arm knows the patient’s exact position and we can, for example, get a perfect image of a blood vessel. It can also make use of previously acquired CT scans. This modern imaging significantly reduces radiation exposure. Large movable screens are suspended around the room so that everything can be monitored and compared easily. This makes it possible to carry out even more procedures through the blood vessels, resulting in fewer complications and a shorter hospital stay.”
The new operating theatre is equipped with an Opragon ventilation system, in which the familiar ceiling diffusers ensure ISO Class 5 throughout the entire room. The lighting system can bathe the whole operating theatre in green light, which is less tiring for doctors and operating theatre staff.
Proven technology
Thanks to intensive preparation, the GHZ hybrid operating theatre was completed in a very short time. “And on a very challenging site,” Kamerbeek adds. “The new room is now in the best location, close to all the operating theatre facilities, but it was the most difficult place to build. In the end, we completed the project within budget and without a day’s delay. The secret lies in the preparation and good cooperation. Together with the medical staff, we visited several hospitals to select the best proven technology and find out whether it would work for us and fit the available dimensions. The design team (EGM architecten, Deerns, Aronsohn and OKCN; ed.) then rapidly drew up a design for the courtyard site, which was developed into a technical design with the contractors in the second half of 2022. We had all worked well with the contractors before. We complement one another and achieve results faster. It was a positive experience. The permit came through at Christmas, and the first bored pile was driven into the ground in April 2023. Just eighteen months later, the first patient was treated.”
Minimal disruption
The construction itself was a story in its own right. Kamerbeek: “There was hardly any space, and the hospital had to be able to carry on as usual. It was a serious puzzle. Together with contractor J.P. van Eesteren, we decided to put the tower crane in a different courtyard and transport most of the equipment and materials over the roof, in smaller quantities and sizes. A protective structure was built on the roof using props, EPS blocks and trackway panels to protect the roof and plant. The piling rig, which bored the piles that were welded together, was lifted into place over a weekend. Construction work, particularly work causing noise and vibration, was carried out in close cooperation with the operating theatres and neighbouring departments. We held a weekly drop-in session for staff, which worked very well. The result was almost no complaints, even though an operation was sometimes under way just five metres away. I would be happy for every project to go like that.”
Progress
Vascular surgeon Schlejen is extremely pleased with the new operating theatre. “We can take further steps to improve our field, and that will mainly benefit patients,” he says. “With this hybrid facility, we can carry out an increasing number of procedures non-invasively. That means better, shorter treatments, with less risk of complications and a shorter hospital stay. Not long ago, replacing an aorta meant open reconstruction and ten days in hospital. Now it can be done through the groin, and soon it will even be a day-case procedure.”
Designed as an integrated whole, built for the future
Completing an operating theatre requires a high level of collaboration. Cleanroom Combination Group knows all about that. The company contributed to the new hybrid operating theatre at Groene Hart Ziekenhuis (GHZ). The result is a highly functional finished space, with all the latest technologies and facilities seamlessly integrated.

Cleanroom Combination Group (CCG), which was also involved in the construction and maintenance of eight standard operating theatres at GHZ ten years ago, was approached by J.P. van Eesteren in 2022 to help design the hybrid operating theatre. CEO Michiel van Kooten: “We sat down with GHZ, EGM Architecten, Deerns, OKCN, ULC and the contractor to develop an integrated design, with each party contributing its own specialist expertise. One of the aims was to rule out as many risks and setbacks as possible during construction. There are many suppliers and items of equipment to consider, including screens, warming cabinets, a C-arm and other plant. ‘It doesn’t fit’ was not an option during construction, as that would cost time and money. The intensive preparation resulted in a highly attractive, functional hybrid operating theatre that came in on budget and is future-proof.”
Up to date
For the walls, the choice was a fit-out using modular frames and Trespa Toplab wall panels. “These panels offer high chemical resistance, impact resistance and scratch resistance, and are easy to clean and disinfect,” explains Project Manager Bart Flaman. “CCG’s system is easy to adapt, so you get an operating theatre that stays up to date for a long time. The clean utility room and sterile storage room were fitted out in the same way, and here too the building services had to be integrated with the fit-out. It is helpful that we design in 3D Revit, so we can have everything prefabricated accurately.”


Floor and ceiling
Cleanroom Combination Group finished the floor with Forbo Colorex tiles. They are static-dissipative, electrically conductive, easy to maintain and can be replaced one tile at a time. “The ceiling was the last element to be completed,” Van Kooten concludes. “That always requires the most coordination, in this case mainly because of commissioning the operating theatre and the Philips C-arm. The new hybrid operating theatre looks very good, and we are very proud of the end result.”
Established team delivers complex project. Building services for the hybrid operating theatre at Groene Hart Ziekenhuis
Building a new operating theatre is usually a fairly complex undertaking. When it also has to be built between two existing sections of a building, on a small site near eight operating theatres, two of them adjoining, that must remain in use, and with the requirement to cause as little disruption as possible, it becomes a truly complex project. “In that situation, you are certainly glad to be working with a team you have worked with for ten years,” says Aad Wepster, Senior Project Manager at ULC Installatietechniek. “Without a strong team that works well together, you cannot get it done on time
without a hitch.”

ULC Installatietechniek was responsible for all electrical and mechanical building services during construction of the new hybrid operating theatre at Groene Hart Ziekenhuis in Gouda. Wepster: “We are an established team, working with the client, J.P. van Eesteren, EGM architecten and consultant Deerns. We operate as one party with shared objectives, and everyone’s interests are equally important. That makes it possible to draw up a sound schedule. Everyone knows exactly what needs to happen and when, which prevents unnecessary and costly delays. The main challenge was the logistics, with equipment having to be lifted over the roof. Another challenge was working right next to an operating theatre complex that was still in use. At one point, we had to make necessary changes to the control system for the main switchboard. This meant cutting off the power to the entire hospital for just over three quarters of an hour, except for critical areas such as the ICUs and SER room. That also went smoothly, and we took the opportunity to make changes that will be needed in the future.”

Close coordination
For the new hybrid operating theatre, ULC installed new air-handling units with the necessary control systems on the services level and connected them to the rest of the hospital. “The electrical work included the power supplies for the operating theatre, particularly for the C-arm, the data network and all connections to the SER room and fire alarm system,” says Wepster. “Having a plant room directly above the operating theatre means shorter service runs. The number of ducts and pipes above the ceiling is kept to a minimum, which is helpful when maintenance is required. The Opragon system is integrated into the ceiling. It provides a very clean working area for operating theatre staff, even with an X-ray machine moving through the airflow. As with every aspect of this project, everything has been taken into account, and that will continue to pay dividends for years to come.”
Have a business enquiry for CCG Holding? Get in touch
Who worked on it
Groene Hart Ziekenhuis hybrid operating theatre in Gouda
- finishing
CCG - electrical and mechanical installations
ULC Installatietechniek - contractorJ.P. van Eesteren
- architectEGM architecten
- adviserDeerns
- design teamAronsohn
- C-boogPhilips
Keep following this
Get an email when a new story is published. No account needed.
- ProjectGroene Hart Ziekenhuis hybrid operating theatre
- SubjectHospitals
- CompanyCCG Holding
- CompanyULC Installatietechniek
- CompanyJ.P. van Eesteren
- CompanyEGM architecten
- CompanyDeerns