Patients flow efficiently through Amphia Treatment Centre

Amphia Hospital in Breda has every reason to be proud of its brand-new Treatment Centre. The multidisciplinary complex includes six operating theatres, eight treatment rooms and fifty beds. The biggest challenge in its development was to use carefully planned patient flows to deliver high-quality, but above all efficient, care without compromising the identity of the various specialities.

“Responding to market needs.” It sounds like the start of a conversation with a multinational. But Jasper Meijer, Project Director for the Amphia redevelopment, says that this terminology also applies to healthcare. “Improved techniques mean procedures are quicker, resulting in higher patient throughput. Procedures in the Treatment Centre often require less aftercare too, with patients getting moving sooner. They can go straight home or stay for one night. We chose to provide this care in a self-contained Treatment Centre for day procedures and other procedures involving, for example, the knee, hip, eyes, skin, nose or groin. We set it up as a separate entity in the building that previously housed the operating theatres and inpatient wards, adjacent to Amphia’s new building.”

Creativity and flexibility
Meijer is joined by New Building Project Manager Gerard Jacobs, Treatment Centre Business Manager Mirjam Nagtegaal and Architect Rick Bruning (Wiegerinck, Arnhem). Jacobs says: “Accommodating all the existing departments in the building called for creativity and flexibility. The first steps were taken two years ago, construction began in 2020 and the first patients were treated last May.” In the preparatory phase, project groups including all the users considered floor plans and worked together to find solutions to a range of issues. “Sharing operating theatres and treatment rooms without losing each department’s identity was an important principle for all the specialities.” Meijer says that perhaps the biggest puzzle was managing patient flows effectively. “Especially given the high throughput and the diversity of patients at the Treatment Centre.”

Expectations have been met
The calm atmosphere suggests that the various departments, working closely with the architect, have solved that puzzle harmoniously, as a tour of the centre reveals. Spacious corridors, pleasant colour schemes and windows that let in plenty of daylight. “Expectations have been met. Staff are very enthusiastic,” says Nagtegaal, reflecting on her own experience and that of her colleagues. She explains that, as well as the many specialities, the needs of different types of patient were also taken into account. “Children need a different welcome from adults. The intake process also differs between specialities. We have succeeded in accommodating those differences throughout the centre.” Since the Treatment Centre opened, patient throughput and their treatments have been monitored. Nagtegaal says: “The aim is to reduce throughput times wherever possible, so that we can help as many people as possible.”

The departments’ users laid the foundations through consultation, while Bruning brought the project together architecturally. He did so with flair and, above all, expertise: he has worked on hospital projects for many years. “After a long lead-in, the existing hospital was tackled layer by layer, outpatient department by outpatient department. So much was stripped out that it is fair to call the project a redevelopment.” It took considerable creativity to meet all the requirements across two floors. “It wasn’t just about fitting in everything people wanted, but also about carrying out the work while the hospital remained operational. That meant planning demolition work, for example. We stripped out sections, but retained the main infrastructure routes, including those for air handling. We designed around them,” Bruning recalls. The redevelopment also gave the centre a luxurious look, more like something patients would expect at a private clinic than at a hospital treatment centre. “But there is a clear connection with Amphia’s new building.” Lessons learned from the new-build project were, of course, applied to the engineering. The similarities between the fit-out of the operating theatres in the new building and those in the Treatment Centre are also important. “The Treatment Centre may be a self-contained unit, but specialists will find the same layout in the new building and in the Treatment Centre. This makes it easy to switch work locations, and the high-spec operating theatres, including their image-routing systems, feel familiar,” says Meijer. Amphia Hospital’s refurbishment is not yet complete. The ‘midlife renovation’ and review of the departments and office functions will continue until the end of 2022.

PTG Advies b.v. on Amphia Hospital
After supporting the development and delivery of the new building for Amphia, we were also involved in renewing parts of the existing building at the Molengracht site. Earlier this year, a brand-new treatment centre was completed and opened in the existing building. This sub-project presented a challenging brief: the old operating theatre complex was converted into a modern, high-quality centre for planned, low-complexity procedures.
What will future care processes look like? How do you want to work in the new centre? What matters to patients? How will we address privacy and reduce uncertainty, and make their stay as pleasant as possible? And how can we achieve all this in the existing building? To turn these questions into a good design for the treatment centre in a short time, we used our ‘Collaborative Design Weeks’ concept: intensive, creative design sessions over one week, with everyone involved, including staff, doctors, in-house experts and support teams. Freeing up everyone’s diaries was a challenge, but the sessions delivered a great deal: a plan developed with enthusiasm and energy, and one that has strong support across the care organisation. With its new treatment centre, Amphia can help patients even better and more quickly, while providing its staff and doctors with a pleasant working environment.
A lovely compliment came from one of the users involved: ‘It’s great that you take such an interest in our work processes and that we can see them reflected in the plan!’
We are proud of the result and of our excellent collaboration with the teams at Amphia and Wiegerinck architecten, and wish everyone who uses the new centre an enjoyable working life!
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeHospital construction and refurbishment
- SubjectHospitals