Regional acute hospital opens its doors in Antwerp-East
Text Koen MortelmansImage Paul De Roeck

On Sunday 17 March, Flanders held its 13th ‘Dag van de Zorg’. Numerous care providers took the opportunity to showcase their strengths, story and latest facilities to a broad audience at an open day. AZ Monica also gave visitors the chance to look around its newest wing, where interior fit-out work is currently in full swing. It is due to open this autumn.
The additional hospital wing, the E-wing, is needed to meet rising demand for care and treat patients in a contemporary setting. The new wing will house consultations that currently take place in outbuildings, including orthopaedics and gynaecology. The arrival of the new wing will also make it possible to organise the medical imaging department more efficiently. The first floor will house a fully equipped outpatient rehabilitation facility, while the second will accommodate the psychiatric department, for both day and multi-day admissions. Inpatient wards will occupy the third to fifth floors. There will also be space for greenery, including a new small park right next to the hospital.

Regional acute hospital
The long-term strategy for the AZ focuses on low-variability procedures and rehabilitation at the Antwerp campus. The Deurne campus will remain a general hospital, also serving as the regional acute hospital for Antwerp-East, with a fully equipped emergency department and a broad range of medical specialities. The emergency department is to undergo a thorough refurbishment and, in collaboration with GPs, will be integrated with the existing GP out-of-hours service.
Willemen Construct (Mechelen) is the main contractor for the E-wing, designed by Assar Llox Architects (Antwerp, Brussels). Engineering firm Botec (Wommelgem) is responsible for the design, specification and supervision of the sanitary and fire-fighting systems, climate control, electrical systems, including lightning protection and the emergency generator, medical gases, the pneumatic tube system, smoke and heat extraction, and the sprinklers in the car park.
Een zakelijke vraag aan Assar Architecten? Get in touch
Wie aan E-vleugel werkte
- main contractorWillemen ConstructIn this story
- Engineering consultancyBotecIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectE-wing
- SubjectHospitals
- CompanyAssar Architecten
- CompanyWillemen Construct
- CompanyBotec



















