A straightforward contract for a complex demolition

Visitors to Rijnstate, the hospital in Arnhem, cannot fail to notice: demolition is under way on the hospital complex’s forecourt, where the old nurses’ residence is being torn down. Imposing cranes are dismantling the 15-storey building. It is a precision job, as space is limited.
The nurses’ residence, with a gross floor area of 6,500 square metres and a height of 45 metres, was built in the late 1950s. In recent years, the ageing ‘tower’ housed various staff departments, but it no longer fits into the hospital’s overarching masterplan. Following an extensive selection process, demolition contractor Heezen bv of Eindhoven was selected to carry out the work.

One of the complicating factors: the ramp to the car park runs right alongside the building being demolished. (Image: Uitgeverij Gelderland)
Japanese demolition method
Heezen has extensive experience of demolition work in healthcare settings. Harm Schraven, Technical Project Adviser at the company, explains what makes this demolition so complex. “Space is limited here. The building is also very close to the access road to the car park. That is why we are ‘peeling away’ the top five floors using the Japanese demolition method, with a crane positioned on the top floor and working its way down, ‘eating’ through the building one floor at a time. Only from the 10th floor down can we use a crane alongside the building, working from ground level to continue the demolition. We began dismantling the building in September 2019. This had to be done carefully, as we wanted to make as many materials as possible available for reuse. Some of the façade cladding, for example, has been used in another project, while some of the rubble is being processed for use as a sub-base for the hospital’s new car parks. The dismantled fire escape stairs will also be given a new purpose within Rijnstate.”

The nurses’ residence has 15 floors, is 45 metres high and has a gross floor area of 6,500 square metres.
(Image: Heezen bv)
Tender requirements
Safety, scheduling, retaining car parking facilities, circularity and sustainability were key considerations for the hospital in the demolition of the nurses’ residence. Programme Director Willem Jan Hanegraaf explains: “We were looking for a company with experience in healthcare. You are working in a hospital environment in a residential area. How to manage noise, dust and vibration was covered in detail in the tender requirements.” Naturally, when looking for the right partner, it is important that they have the right expertise and certification, but there is more to it. Hanegraaf: “Together with adviser AltaVilla, we drew up a longlist and shortlist of potential demolition contractors. We invited all the companies to present their proposals and set out our vision for the demolition. In the end, we chose Heezen. Mutual trust is important to the partnership. We select on quality, not price. The partner may not be the lowest bidder on paper, but experience shows that if the whole process runs smoothly, you end up paying less overall. We meet every two weeks to discuss progress. Both sides have an interest in things going well. If you understand each other’s position, you can always find a way forward.”
Schraven is also pleased with the procurement process and what followed. “Rijnstate invited several of the companies that had registered their interest to give a presentation. That kind of presentation ensures maximum transparency. You know exactly what is expected. The brief was very clear, so you can put together a focused plan of approach. That is how, in the end, you get a very straightforward contract for a complex demolition.”

Heezen bv’s employees know full well that safety comes before speed. (Photo: Uitgeverij Gelderland)
Next steps
Both parties have agreed that the entire building must be dismantled by April. All the materials must also have been removed by then. The cleared site will initially be used for parking, but may eventually be put to another use in keeping with the hospital’s overall masterplan.
Question about this story? Ask your question
Who worked on it
Rijnstate Arnhem nurses’ accommodation in Arnhem
- sloopbedrijfHeezen bv
- adviserAltaVilla
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRijnstate Arnhem nurses’ accommodation
- SubjectGeneral
- CompanyHeezen bv
- CompanyAltaVilla