General

Assisted living apartments built to the highest standards

De uitpandige terrassen werden net als de trappenkernen geprefabriceerd in de DCA Concrete-fabriek in Olen.
De uitpandige terrassen werden net als de trappenkernen geprefabriceerd in de DCA Concrete-fabriek in Olen.

Demand for adapted housing for older people has surged in recent years. Fortunately, the choice in Linden has grown a little, with an old farmstead on Leuvensesteenweg, close to the charming village centre, making way for Koninksveld, a residential complex with 44 accredited assisted living apartments. The older residents who have moved in over the past few months can now fully enjoy their new home, including its lovely views of the greenery behind the complex. The construction and site management also make this a project worth holding up as an example.

Buildability was taken into account from the design stage. This helped boost productivity on site.

A central location, high-quality homes, welcoming communal areas, including a cosy café, and a large garden with a spacious terrace: Koninksveld has plenty to offer. Carl Ceusters, project manager at DCA, the construction company responsible for delivering the complex, agrees. “The ground floor has extensive glazing, so you can practically see right through the building, which is a huge asset. Large rooflights in the communal areas also provide abundant natural light, creating a very open feel. The stunning views of the green surroundings are the icing on the cake.”

Careful choice of colours and materials

Koninksveld comprises two blocks, each with three above-ground storeys, linked by a ground-floor section containing the entrance and communal areas. The fact that the entire building has a basement is a significant advantage. The spacious basement, built in in-situ concrete, houses 25 underground parking spaces, bicycle storage, storerooms and a communal plant room with a large gas boiler that supplies the satellite boilers in the assisted living apartments. Elsewhere in the building, the load-bearing internal walls are made of calcium silicate blocks, while the non-load-bearing internal walls are made of gypsum blocks. “This meant we could finish the entire interior with skim plaster,” says Ceusters. 

Koninksveld comprises two blocks, each with three above-ground storeys, linked by a ground-floor section containing the entrance and communal areas.

“The floors are made of predalles, with the electrical wiring, light fittings and ventilation ducts cast into the concrete topping. The façades are clad in nuanced beige-grey facing brick, complemented by projecting terraces which, like the stair cores, were prefabricated at our DCA Concrete factory in Olen. Buyers could finish their homes to suit their preferences, choosing from three packages that each create a distinctive atmosphere through a carefully considered selection of colours and materials: classic, sleek or warm. Every apartment is also fitted with a call system from Essec, enabling residents to ask for help or send an emergency alert if needed.”

Excellent collaboration

Although the project was delivered during the Covid pandemic, construction of Koninksveld suffered little or no delay. This was thanks to DCA’s proactive approach: after the general lockdown was announced in March 2020, the company did not simply sit back and wait. “We immediately looked at how we could safely resume work, so the site was closed for just two weeks,” Ceusters explains. “We were fortunate that we were still carrying out the basement shell works and working outdoors at the time, so it was manageable with the necessary safety measures in place: workers travelling to site in their own cars or reserve vehicles, keeping their distance in the excavation, and paying particular attention to hygiene. We completed the building in early March 2022.”

DCA has nothing but fond memories of this impressive project, thanks in large part to the excellent collaboration with the client and architect. “It was a great advantage that buildability was considered from the design stage, for example by keeping complex details to a minimum. This helped boost productivity on site. Communication between everyone involved was also smooth, open and solution-focused from the outset. The client and architect valued our expertise. For example, the resin floors and skirting in the bathrooms form a single continuous surface, making them easy for wheelchair users to access. I had already seen the benefits of this ‘tanked’ approach over traditional sloping tiled floors when working on earlier assisted living projects. We were committed to quality and functionality, without compromising the overall architectural design. If every project went this smoothly, I’d be a happy man,” Ceusters says with a wink.

Question about this story? Ask your question

Who worked on it

Koninksveld in Land van Cuijk

  1. ClientSolid Wonen
  2. ArchitectAtrio architecten associatie
  3. Main contractorDCA
  4. oproepsysteemEssec

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKoninksveld
  • SubjectGeneral
  • CompanySolid Wonen
  • CompanyAtrio architecten associatie
  • CompanyDCA
  • CompanyEssec
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.