Engineering consultancy for building services

Founded in 1992, Wommelgem-based engineering consultancy BOTEC is a dynamic firm responsible for the building services design of buildings. Thanks to the drive of its directors and staff, this leading company enjoys an excellent reputation in the construction sector.
BOTEC’s core business is the design and coordination of all building services. With dedication and vision, its design team creates plumbing and sanitary systems, electrical installations, HVAC systems, transport systems, kitchen equipment, and distribution networks for medical and industrial gases. As an expert with extensive experience in the healthcare sector, BOTEC is regularly engaged on a range of new-build and refurbishment projects for residential care centres and hospitals. It also works on educational facilities, offices and industrial buildings. “All our designs focus on the rational use of water, energy and raw materials as part of sustainable construction,” explains managing director Ilse Cromheeke.

Climate-friendly building services
BOTEC committed wholeheartedly to climate-friendly technologies many years ago. In 2009, for example, WZC De Spoele in Sint-Niklaas opted for ground-coupled heat exchange via earth tubes, thereby avoiding active cooling. This environmentally friendly solution was also chosen for Hof ter Schelde in Antwerp, meaning the gas heat pumps originally planned were not installed and the boilers’ thermal capacity was reduced by 10%. “Since lighting accounts for a large share of electricity consumption, we specified LED lighting throughout as early as the 2014 design brief,” says Cromheeke.
In 2015, Building Z at the University of Antwerp incorporated, among other features, a BEO field, a six-pipe heat pump, a gas heat pump and thermally activated building systems. Recent designs include the electrical installations for the Rijksarchief Antwerpen, the complete replacement of the kitchen at WZC Sint-Jozef in Lier, and the expansion of the cooling system at WZC Filfurdo in Vilvoorde. The latter was carried out in 2020, after BOTEC had designed all the building services for the new-build project in 2017. All installations, of course, comply with current legislation, which is subject to continuous change.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral


















