General

New-build Neos: Built for the future

Nieuwbouw Neos.
Nieuwbouw Neos.

A modern new apartment complex has been built on the site of the Labrehuis in Eindhoven under the Neos banner. Neos provides accommodation for homeless people and people at risk of homelessness, as well as victims of domestic abuse.

Commissioned by housing association ‘thuis, the building was delivered by contractor Huybregts Relou and designed with various future scenarios in mind. Mariëlle de Reuver and Guido van Kempen, both members of Neos’s management team, explain why the new building was essential to the care Neos aims to provide. Wouter Bezemer, managing director of Huybregts Relou, looks back with great pleasure and satisfaction on the construction process and the excellent collaboration with ‘thuis, housing specialist Laride and end user Neos.

Reused mosaic.

Neos’s mission is to help vulnerable people who have become homeless or at risk of homelessness due to complex problems, victims of domestic abuse and others in need of supported living to participate in society as independently as possible. Van Kempen: “For many years, Neos has provided accommodation, care and support for these groups. However, the previous building, the former Labrehuis, no longer met today’s requirements. As with several other large care providers, there was too little privacy, and sometimes several people even had to share a room. If you want to prepare people properly for a successful return to society, greater independence is important, including while they are receiving support. The new studios have all the modern facilities and spaces needed to enable staff to provide the best possible support and help residents prepare for a home of their own. Having their own front door, kitchen and sleeping area is essential.” De Reuver: “Having their own front door also means residents establish a direct relationship with the housing association and learn straight away how to be good tenants. This includes keeping their surroundings tidy and paying bills on time. These are long-term processes. On average, our residents stay here for one to two years.”

A strong say in the design

De Reuver: “The studios are approximately 19 m² and include all the facilities needed for independent living. One special feature is that both residents and our staff had a great deal of input into the design of the studios, and this even led to the creation of a multifunctional piece of furniture. The colour schemes were also developed by the residents in consultation with the interior architect. As a result, the design is ideally suited both to the people using the building and to the care we aim to provide. The building also has 16 apartments for people taking an intermediate step towards a more independent living environment after their stay in supported accommodation.”

Wouter Bezemer, managing director of Huybregts Relou.

Excellent collaboration

The contractor responsible for building the 80 studios and 16 apartments is Huybregts Relou, a company with extensive experience delivering construction projects in the care sector. Wouter Bezemer says collaboration with everyone involved in the project went extremely well. However, the start of the project did bring an unpleasant surprise: “During demolition, we found asbestos in places where we hadn’t expected it. We brought in a specialist partner to remove it. In fact, we use our regular partners and specialists for almost every aspect of a project, while retaining overall control ourselves. The new building is ready for the future. If necessary, the 80 studios can be converted into larger apartments relatively easily. We have already allowed for where the front doors would need to be on the gallery. All the building services and utility connections are ready for this too. The building is fully electric, with no gas or heat pumps, but plenty of solar panels.”

A practical layout

The building has a very practical layout, says Bezemer. “In large buildings, space is often not used to its full potential, but here every square metre has a purpose. The architects have done an excellent job. We have also brought back some striking features from the old building in the new development. We were able to reuse a beautiful mosaic, and several distinctive stained-glass windows are reminders of the Labrehuis that once stood here. The building was ready for use within two weeks of handover, thanks to the highly
efficient fit-out organised by Neos in consultation with ‘thuis, Laride and us. Lines of communication were short, making communication clear and effective. I trust this will continue, as we will also be responsible for maintaining the building in collaboration with ‘thuis and Neos.”    

Question about this story? Ask your question

Who worked on it

Neos Eindhoven in Eindhoven

  1. housing association‘thuis
  2. huisvestingspecialistLaride

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectNeos Eindhoven
  • SubjectGeneral
  • Company‘thuis
  • CompanyLaride
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.