New build supports warm, experience-led care

Sint-Bernardus has been a household name in elderly care in De Panne and the surrounding area for many years. However, the buildings were becoming increasingly ill-suited to meeting modern comfort requirements. The management seized the opportunity to use the architecture to emphasise warmth and a homely feel. Furnibo did an excellent job of making the new building watertight and airtight without causing disruption to residents.

The new building has been positioned so that the brasserie can connect more closely with the street, while also letting light from the garden stream inside.
The municipality of De Panne has had a long-standing commitment to elderly care. In ’52, the Bernardine Sisters moved into the former Grand Hotel de la Panne on the Koninklijke Baan. Rev. Blomme, parish priest of De Panne, had approached the congregation in Oudenaarde to care for older people in his area. They renamed the building Sint-Bernardus, a name that has since become synonymous with warm, experience-led care. A new milestone followed in 2018. By then, the last sisters had moved to Oudenaarde and Bassevelde. The former monastery building and adjacent buildings were demolished to make way for a new residential care centre (wzc). Director Frank Vanfleteren: “The wzc was in urgent need of modernisation. With the existing infrastructure, it had become extremely difficult to meet modern comfort requirements. We explored various options and looked at several locations, but in the end I’m pleased that we were able to deliver this project on our familiar site, in the heart of De Panne, overlooking the town centre and the sea.”

The aim was to avoid the stigmatising, typical care-home environment and instead create a warm, homely look.
Creating a sense of home
The plans for the new wzc were built around two pillars. “It shouldn’t look like a traditional wzc. We want our residents to feel at home, as if they were in their own cosy flat. We also wanted an architectural design that could support our ambition to provide warm, experience-led care, with a strong focus on safety and comfort.
These two principles influenced everything, from the shell construction to the integration of building services. Every decision we had to make was tested against the question of whether it would help residents feel at home. That was always our benchmark,” says Vanfleteren. Furnibo proved to be the perfect partner for putting these objectives into practice. The Veurne-based construction company works in both the public and private sectors. For this project, Furnibo was responsible for the demolition and shell construction, and handed over a watertight and windproof building.

“We were able to keep all the residents and staff on board throughout the renovation, with minimal noise disruption. This was partly thanks to Furnibo’s professional approach, with its focus on order, cleanliness and discipline.”
Maintaining continuity during construction phases
The project’s greatest challenge was to maintain continuity of care and residents’ comfort throughout the various phases. Demolition work began in the first months of 2018. Furnibo had therefore already laid the foundations for the modular building in 2017. This temporarily housed 24 assisted living units and various services during the works. Vanfleteren: “We were able to keep all the residents and staff on board throughout the renovation, with minimal noise disruption. This was partly thanks to Furnibo’s professional approach, with its focus on order, cleanliness and discipline. The company has an excellent reputation in the region, and it lived up to it in full on this site. Although the architect had specified 100% of the materials, whenever construction-related problems arose, Furnibo always looked for the most practical solution. For example, a peat layer was found beneath the building. By excavating part of it and making the basement slab slightly thinner, they came up with an elegant solution that avoided costly works.”

The choice of solid wood tables is another way to reinforce the homely, family atmosphere.
Built for the future: modular structure
Sint-Bernardus is now in the final phase of the project. Most residents moved into their new rooms in February. Between February and June, the remaining wings will be stripped back and rebuilt. The kitchen is also getting a makeover. Once the work is complete, the wzc’s capacity will not have increased significantly. The number of rooms has risen from 118 to 126, six of which will remain reserved for short stays. But all of them now have a warm, homely atmosphere and an area of around 27 m². Vanfleteren and his team have also been looking ahead: “When drawing up the specifications, we considered what care might look like in 2040 and what needs might arise. Working from the architect’s design, Furnibo set out to create as few load-bearing lines as possible, making the building as modular and therefore as future-proof as possible. This gives us plenty of flexibility to adapt as things evolve over the years.”

The number of rooms has risen from 118 to 126. But all of them now have a warm, homely atmosphere and an area of around 27 m².
Architecture in support of care
Vanfleteren is particularly proud of the work completed so far. “A huge amount of work has gone into overcoming all the limitations we faced in the old building. Sometimes it was a matter of simple things, such as a kitchen and a water tap on every floor. We also seized the opportunity to make improvements to comfort and safety wherever possible. No technical gimmicks or
decorative flourishes, but practical changes that help create warmth and a homely feel, while encouraging and stimulating our residents.” One feature Vanfleteren is keen to highlight is the new brasserie. “The new building has been positioned so that the brasserie can connect more closely with the street, while also letting light from the garden stream inside. It will house a social restaurant to strengthen links with the local community even further. It is also a project that has received European funding under the Smart Cities programme, making us the first wzc in Flanders to do so.”
Question about this story? Ask your question
Who worked on it
Sint-Bernardus in De Panne
- contractorFurnibo
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSint-Bernardus
- SubjectGeneral
- CompanyFurnibo