Noordkant UMC

A lively, sustainable and welcoming city square for education, research, culture, sport and leisure is taking shape on the north side of the UMCG. RUG and UMCG have signed a framework agreement for the development of the area around Antonius Deusinglaan.
City square
Around a city square (0), RUG will build a large education centre for Pharmacy and Medical Sciences (1), a location for University College Groningen (2) and the Usva cultural student centre (3). There is also sufficient space for UMCG’s future development plans (4 and 5).
Lively campus with new city square (0)
The public space will have an open connection to the city centre. At the heart of the development plan is the city square, with buildings around it. The ground floors of these buildings will accommodate cafés, restaurants and retail outlets. All of this is set out in a Spatial Masterplan. To ensure good accessibility, a public transport hub will be built in phases between now and the end of 2020. The plans also include underground or indoor bicycle parking for those arriving by bike.
Education centre (1)
Students of pharmacy and medicine will mainly attend their lectures in the planned new, modern teaching spaces on campus. This 9,000 m2 education building will be located next to the ERIBA building, near UMCG’s new Proton Therapy Centre.
University College Groningen (2)
University College Groningen (UCG), one of RUG’s faculties, will move into the building at Bloemsingel 1. The front façade is a protected townscape and will be retained, while the building itself will be renovated and extended. New locations are being sought for UMCG’s ICT department and LifeLines, which are currently based at Bloemsingel 1.
Usva cultural student centre (3)
USVA and the Health Data Center will move into the existing ADL2 building. It will house studios, course rooms and a new student theatre with a capacity of approximately 200 people.
Development sites for UMCG’s future plans (4 and 5)
UMCG has reserved space on the site for development at a later date. Until then, Block 4 will be used for construction-related activities, while Block 5 will remain vacant for the time being and can be used for temporary themed activities.
Planning
The entire area will be developed in phases. During 2018 and 2019, architects will work on various design projects. In the meantime, the first preparatory infrastructure and demolition works will take place. Work will also begin on the public transport hub to ensure good accessibility. The first projects are expected to be completed between 2020 and 2022.