General

Refurbished Sint Joris care centre offers freedom in a protected environment

Refurbished Sint Joris care centre offers freedom in a protected environment

Close collaboration between the construction team members safeguards quality and efficiency. The new main site of Joris Zorg in Oirschot offers as much freedom of movement as possible within a protected setting. Through renovation and new construction, the care provider is anticipating growing demand for nursing care in a small-scale setting. The design has broad support, thanks to the many ways in which staff, residents and families were able to contribute. This resulted, for example, in the addition of cooling to the building. Close collaboration between the architect, contractor and care provider benefited the quality and efficiency of the construction project.

Close collaboration between construction team members safeguards quality and efficiency

The new main site of Joris Zorg in Oirschot offers as much freedom of movement as possible within a protected setting. Through renovation and new construction, the care provider is anticipating growing demand for nursing care in a small-scale setting. The design has broad support, thanks to the many ways in which staff, residents and families were able to contribute. This resulted, for example, in the addition of cooling to the building. Close collaboration between the architect, contractor and care provider benefited the quality and efficiency of the construction project.

In response to growing demand for nursing care due to an ageing population, the Sint Joris care complex has been reorganised and expanded. At the heart of the redevelopment in Oirschot is the entrance building with its communal living space. Facilities here include a hair salon and a restaurant with a large television and a pool table. The use of wood on the floor and in the columns and wall finishes creates the atmosphere of a traditional Dutch brown café. Numerous windows and sightlines give the central space an open feel. From the restaurant, visitors can look out over the new courtyard garden, designed by students from HAS in ‘s-Hertogenbosch.

“We invested in freedom of movement for our clients,” says Joris Zorg chief executive Arnold Vosters. “Our refurbished care centre is open and welcoming. Whereas meals and drinks used to be served at set times, clients, family members and local residents can now choose what they eat and drink, and when, between 8.00 and 21.00. Our meals are made using local produce and served on site or delivered to people’s homes. The central space encourages people to meet and take part in club activities.”

Protected living environment
Since the project was completed, clients receiving psychogeriatric care have been living in groups of eight and sharing a living room. Previously, groups consisted of sixteen people. Each client in this part of the building has their own bedroom and bathroom. Clients receiving somatic care have their own self-contained flats.

“The refurbished and new spaces at Joris Zorg in Oirschot are heated, cooled and ventilated using climate ceilings,” says project architect André van de Ven, who also oversaw the project on behalf of the design team. Cooling was added to the design at the request of residents, to make extremely hot days more comfortable. The new climate control technology not only improves comfort, but is also more energy-efficient than the old system, as it uses heat and cooling from the ground. The building is also equipped with a wandering detection system to protect people with dementia from harm as far as possible. In addition, each room has its own fire compartment, providing this vulnerable group with extra safety.

Keeping the care centre operational
The project was carried out in phases to minimise disruption from the construction work and the number of moves. Some clients were temporarily accommodated elsewhere on the site. For example, construction work did not start too early in the morning and finished promptly in the evening.

“In early April 2013, Bouwgroep Moonen broke ground,” says Vosters. “Work began with the new building on Doctor van Wamelstraat. This allowed the care complex to remain operational. Three floors were divided into separate residential units, and an entirely new entrance wing was built on Jorisstraat. Renovation of the existing buildings began afterwards.”

Van de Ven is also positive about how the project went. “The interest shown by various residents was remarkable. Some brought a chair and sat down to watch the construction progress,” he says. “The project was completed in December 2014, including a completely new outdoor area. Work proceeded smoothly thanks to the close collaboration with the contractor and Joris Zorg’s head of operations. The contribution made by Gerard van den Tillaart of Joris Zorg was particularly significant. The pragmatic approach taken by the entire design and construction team means we can look back on a successful project.”

Hospitality at the heart of new restaurant and grand café
The refurbished Joris Zorg complex in Oirschot now has a distinctive grand café and restaurant. Moeleker was responsible for the design and fit-out. The subcontractor from Goes advises on, designs, supplies and manages efficient, sustainable, turnkey solutions for professional kitchens. Moeleker has also been maintaining the existing kitchen in Oirschot, which it built itself, for twenty years. The former restaurant was also designed and fitted out by Moeleker.

Hospitality was at the heart of the design for Joris Zorg’s new food and drink facilities. Guests are served by hosts, who serve or arrange for the food to be served. In a homely setting, clients, family members and local residents can enjoy a snack, a drink or a full meal. Whereas residents previously had to choose what they wanted to eat well in advance, they can now choose on the spot. The kitchens are fully equipped and modern, making it possible to respond quickly to individual preferences. The restaurant and grand café invite people to enjoy a meal together.

facts & figures

Care provider:    Joris Zorg, Oirschot
Architect:    André van de Ven Architecten BV, Oirschot
Contractor:    Bouwgroep Moonen
Construction management:    André van de Ven Architecten BV, Oirschot
Structural engineer:    Tielemans, ‘s-Hertogenbosch
Electrical installations:    Mansveld, Eindhoven
Mechanical installations/climate control/sanitary installations:    Snoeks, Valkenswaard
Fixed interior:    Van Diessen
Kitchens:    Treuren montage, Vlijmen
Loose furniture/chairs/tables/sofas/curtains:    Thereca, Hasselt
Flooring/curtains:    Spaan
Flooring:    Frunt
Commercial kitchen/restaurant:    Moeleker, Goes
Construction period:    20 months, May 2013 to December 2014
Completion:    December 2014
Total construction costs:    14 million euros, including VAT
Number of beds:    141
Number of living rooms:    psychogeriatric care 4, somatic care 5
Restaurant:    140 seats

Text: Martijn van den Bouwhuijsen    Photos: James van Leuven, Martijn van den Bouwhuijsen and André van de Ven

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.