In June 2020, dentist Noëlle van der Veen took over the dental practice on Nachtegaallaan in Leende. “I fell in love with the little building, its secluded setting and the friendly village straight away,” she says enthusiastically. “However, turning it into the practice I had in mind required extensive renovation, refurbishment and an extension. GB Construct and BCPD helped me with that.”

The building, dating from 1975, had just two treatment rooms, only one of which had been in use in recent years. To offer more specialist services and accommodate growth, the renovated practice now has four treatment rooms. There is ample space to give extra attention to children, young people and patients who are afraid of the dentist. “I had a very clear idea of what I wanted and how I wanted it,” Van der Veen continues, “but I know nothing about construction. So I asked BCPD and GB Construct to take the pressure off me. I already knew both parties from the construction of Tandartsenpost Eindhoven, where I am a partner.” Stephanie Kurvers of BCPD specialises in construction consultancy and the design of primary care premises. She joined the project when a preliminary design was already in place. “I immediately saw opportunities for an extra treatment room and more light. Both are very important to Noëlle, alongside appearance and space.”

Structural challenges

All the building services in the dated premises have been renewed, from lighting, ventilation and extraction to heating and cooling. Working with various subcontractors, GB Construct, a service contractor for the healthcare sector, opted to route most of the services through the ceilings. There are no radiators on the walls. However, company manager André Prins encountered a few surprises in the attic. “The floor no longer met the required load-bearing capacity. We also discovered that the structure differed from the original drawings. So we had to improvise and installed an additional steel structure, which could also support the extension, several metres deep, after the external wall was demolished. It also meant we could remove a load-bearing column from the entrance area, creating an open, welcoming space where patients can receive the utmost attention.” Van der Veen adds: “Our patients really appreciate that personal contact.”

Standards and regulations, now and in the future

As a designer, Kurvers considers more than dimensions and atmosphere: she also knows all there is to know about the regulations and standards that apply to dental practices. The design clearly takes account of the care team’s routes through the practice and the required sterile rooms. Practice staff enter at the back, where the changing room is also located. From there, they reach the corridor connecting the treatment rooms. This minimises cross-contamination between care providers and patients. The sterile room also opens onto this corridor, with red and green lights indicating what is dirty and what is clean. At the front is the entrance, reception desk and waiting area. Behind the desk, a passage leads to the back office. Treatment room 4 is already equipped for future specialist dental care. Kurvers says: “I think few patients realise what is needed behind the doors of a dental practice.”

Planning and improvisation

Construction began in May 2021. As was the case across the construction industry, there were material shortages and long delivery times. “This meant we had to manage the project closely and improvise during construction,” Prins continues. “In some cases, we came up with a temporary solution or bought materials for subcontractors ourselves, such as the insulation for the roofer. The distinctive black Trespa cladding was ‘missing’ for a while, but it was installed in good time before the practice opened on 16 August. To get everything done, we kept working during the construction industry’s summer holiday.”

A well-oiled team

“Having worked with this team several times before, I know what to expect from them,” Van der Veen concludes. “That is why I called GB Construct and brought Stephanie from BCPD on board. They understand what I mean and need only a word. As a result, the refurbishment went very smoothly. André and Stephanie know construction and understand what a modern, future-proof dental practice needs. They took the pressure off me in the right way. And if necessary, I could even call them in the evening.” Kurvers says: “That does not mean we never disagreed. André and I say what we think. In the end, we come up with a solution that meets the client’s objectives. What is more, the people at GB Construct know exactly what it takes to create a practice like this. They know what to look out for, not just in terms of construction, but also when dealing with clients and minimising disruption.”    

Question about this story? Ask your question

Who worked on it

Tandartspraktijk Volmondig in Heeze-Leende

  1. servicebouwerGB Construct
  2. bouwconsultBCPD

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectTandartspraktijk Volmondig
  • SubjectGeneral
  • CompanyGB Construct
  • CompanyBCPD
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.