Interiors

Beatrixziekenhuis Gorinchem takes an ambitious approach to its ICU/CCU refurbishment

Beatrixziekenhuis Gorinchem takes an ambitious approach to its ICU/CCU refurbishment

Beatrixziekenhuis in Gorinchem is in excellent shape. According to the AD Hospital Top 100, the hospital has consistently ranked near the top in recent years, coming in at number 1 this year. The Gorinchem hospital also tops the rankings once again in Elsevier. To achieve this, a hospital needs to consider every aspect of its operations. Clearly, they do that well at Banneweg in Gorinchem.

The same conclusion can be drawn from the results of the recent refurbishment of the intensive care/coronary care unit (ICU/CCU), completed in just eight weeks: no detail was overlooked. The secret? A committed project team, with extensive input from hospital staff.

Spacious ICU room with two service pendants.

Eight rooms

Karin Koedam, head of the ICU/CCU, explains what was refurbished: “The previous layout dated back to the 1980s. The ICU had six beds and the coronary care unit had four. It was already difficult to manoeuvre the beds around, and the growing amount of equipment made the rooms increasingly cramped to work in. There was also little privacy in the ward, and patients had the walls to look at. Not ideal. Last summer, when there are fewer operations, the department was completely redesigned to create eight spacious single rooms: six ICU rooms and two coronary care rooms. Two ICU rooms can be used for isolation and have an anteroom kept under negative pressure. The medication room and team station are on the opposite side of the corridor.”

Project team

The eight rooms in particular are the result of intensive discussions within the project team set up for the refurbishment. Koedam: “Alongside the architect and contractors, the team included many people from the hospital. From our department, that was me and intensive care anaesthetist Margijske van Roest, who also liaised with the doctors. Other representatives included pharmacy, physiotherapy, nursing staff, cleaning, infection prevention, technical services, IT and the medical equipment department. With such a broad team, we were able to consider and develop every aspect and detail. We also visited other hospitals and asked ICU staff about their experiences: what works well and what doesn’t.”

Overal heerst een rustige hotelachtige sfeer, van ontvangstlounge tot dagverpleegafdeling én operatiekamers.

Eight single rooms along a refurbished corridor.

Calm

Beatrixziekenhuis regularly surveys patient satisfaction. In preparation for this refurbishment, it included questions about the ‘ideal intensive care unit’. Koedam: “One finding was that ICU patients are very sensitive to noise. That is why we took extra steps to improve the acoustics in our rooms. You also have to bear in mind that ICU patients can become severely confused or develop delirium. The project team’s Atmosphere and Interior Working Group took this into account. After a thorough selection process, we chose the department’s colour scheme and wall illustrations to create a warm, calm atmosphere. I think we did a good job,” says Koedam with a smile.

Supporting staff

A great deal of thought has gone into patient wellbeing. Patients now stay in a spacious room, where Luxaflex blinds in the corridor-facing windows provide privacy, as curtains are not permitted, and everyone can look outside. “That’s important when you’re in intensive care,” Koedam points out. “But we have also made significant improvements to working conditions for staff. We set up a mock-up room, where we moved things around, tested different options and experimented until we had determined the ideal layout and dimensions.
We can now work easily all the way around the bed. All the medical equipment, monitors, oxygen and electricity are supplied via two user-friendly service pendants, and a ceiling-mounted hoist has been installed. All of this helps provide good working conditions for our staff.”

Isolation anteroom.

Quality

The quality of care is also a top priority. “All the equipment in the patient rooms is connected to the nurses’ pagers on the ward,” Koedam explains. “For example, if an infusion pump runs empty, one of the staff receives an alert. This gives the patient peace and quiet while ensuring they can rely on receiving the care they need.” The hospital’s quality is also reflected in its renewed JCI accreditation. “We are very proud of that, of course, because it shows that we meet the world’s strictest standards for the quality and safety of care.”

Asked whether all the effort and investment are worthwhile, Koedam gives a decisive answer. “You do it for the patients and the staff. We chose this intensive construction process and this approach because we need the results to serve us well for a long time. It was therefore a very high priority. As a team, we are committed to making it happen.”   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBeatrixziekenhuis ICU/CCU
  • SubjectInteriors
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.