Bonheiden, Imeldaziekenhuis | Light, accessible and welcoming

The renovated entrance to Imeldaziekenhuis in Bonheiden immediately catches the eye as you walk along the newly laid esplanade. Behind the project’s contemporary architecture lies a clear vision that is preparing Imeldaziekenhuis for the future. Technical Director Stefaan Claeys explains.
Why was the hospital entrance renovated?
Stefaan Claeys: “The entrance to our hospital had remained unchanged since the early 1980s. In the meantime, we continued to grow and the way we welcome patients and visitors changed. In other words, the old hall had become too small and was no longer suited to today’s workflows.”

“We have now centralised blood collection and sample-taking facilities near the new hall, whereas these functions were previously spread throughout the hospital. The current arrangement is much more convenient for our patients. For the same reason, we have included a visitors’ café in our new hall. Previously, there was just one cafeteria. It was deep inside the hospital and open to staff, visitors and patients. It was sometimes difficult to find a free seat there. We now have enough capacity again.”
“Our need for additional meeting rooms was another reason for starting the project. These rooms are on the first floor, above the new hall. All the necessary technical facilities are in place, so our doctors can now hold video conferences with external colleagues.”
Was this a one-off project, or does the renovation form part of a wider programme?
“We are constantly renewing our facilities, and we need to, because the way we work has changed enormously over the past 10 years. Patients are staying for shorter periods and care is shifting from inpatient stays to day hospital treatment. This requires suitable infrastructure to manage the daily flow of visitors and patients. The maternity ward, paediatric day hospital, breast clinic and diabetes convention have already been refurbished. Now that the new entrance is complete, we are moving on to other projects. For example, we are currently building a new hybrid operating theatre. It will be operational in spring 2020.”

The new hall brings together all visitor services related to sample collection.
How important were energy savings and sustainability in the new entrance project?
“Sustainability, along with functionality and aesthetics, was a decisive factor in all the choices we made. This includes the green roof, underfloor heating, energy-saving ventilation technologies and optimal natural light in the hall, among many other things. Sustainability is also important in all our renovation projects. In early 2019, for example, we installed more than 1,000 solar panels on the hospital roof. Together with combined heat and power, these panels provide 22 per cent of the energy we use. In the longer term, we want to reach 50 per cent green energy.”
How did the design of the new hall come about?
“We partnered with Boeckx Architects. Of course, a great deal of preparatory work goes into a project like this. In the first phase, we identified all the requirements relating to aesthetics, sustainability and functionality. This was done by a working group representing the stakeholders. We then worked through the details in smaller groups, and the architects took it from there.”

Composite tiles and pink benches are eye-catching features in the new hall.
“The result is more than successful. The light and accessibility are immediately apparent, as is the welcoming atmosphere the hall conveys. It is a large space: the new hall has increased the hospital’s area by around 1,800 m2. Visitors quickly feel at home there, and that was top of our wish list for the designers.”
“During the design phase, we had some lively discussions about the materials selected. The composite tiles, for example, were not an obvious choice, as some people thought they looked a little old-fashioned. The pink benches also raised a few eyebrows. Fortunately, everyone is delighted with the end result. We have received nothing but positive comments.”
Did the work go smoothly?
“There were no significant problems. On 1 April 2018, we temporarily relocated the entrance, and the new hall opened on 18 October 2019. We chose to tender the project in several packages, with different contractors handling the structural work, building services, plumbing and finishing. The architectural firm was responsible for coordination.”
You also looked for a partner to run the new visitors’ café.
“That’s right. We selected Lunch Garden through a tender. We decided to outsource the cafeteria because catering is not one of our core activities. At the same time, we wanted to make sure the space’s appearance fitted perfectly with the rest of the new hall, so we agreed some clear ground rules. The café was named Lambertini, after the 14th-century Italian nun Imelda Lambertini. She inspired the Sisters of the Convent of Bethlehem when they were looking for a name in 1933 for the forerunner of the hospital they founded here in Bonheiden. That brings the story full circle.”
Open technology for HVAC
The renovation of the hall at Imeldaziekenhuis also included a new HVAC system. ABN Klimatisatie from Bilzen was awarded this part of the project. Their combination of open technology and a convincing project approach set them apart.
“Imeldaziekenhuis chose us as its main partner for climate control,” says managing director Jo Nelissen. “We installed the HVAC system and underfloor heating, an air handling unit with heat recovery, and a chiller for chilled water.”
“ABN Klimatisatie takes a different approach from the average HVAC partner. Traditional installers generally choose a closed system from well-known HVAC brands and chiller manufacturers, but this creates vendor lock-in. If you want to extend an existing installation at a later stage, it requires a substantial investment.”

The new entrance is a significant expansion for the hospital.
“We are brand-independent and work via an open platform controlled using IoT. On this basis, we provided Imeldaziekenhuis with an intelligent, future-proof HVAC system. This includes secure data communication between the HVAC system and the cloud, as well as various drivers with IP interfaces, such as Modbus, BACnet, OPC, KNX and SQL. This gives Imeldaziekenhuis greater freedom of choice.”
“Our design and installation teams worked closely together on this project, enabling us to complete all the work in 3 months. Our decision to use BIM for project management also helped ensure that the project ran smoothly.”
Question about this story? Ask your question
Who worked on it
Imeldaziekenhuis Bonheiden entrance in Bonheiden
- architectBoeckx Architects
- HVAC-installatieABN Klimatisatie
Keep following this
Get an email when a new story is published. No account needed.
- ProjectImeldaziekenhuis Bonheiden entrance
- ThemeHospital construction and refurbishment
- SubjectInteriors
- CompanyBoeckx Architects
- CompanyABN Klimatisatie