Interiors

Hospital special: University Hospital, Brussels

Hospital special: University Hospital, Brussels

The paediatric department at Universitair Ziekenhuis Brussel has recently been equipped with a completely new cooling system with a capacity of 1.5 MW. The existing hydraulic set-up was optimised, and a free-cooling concept was developed at the same time to make substantial cuts to the energy bill.

The renewal of the cooling system at the Children’s Hospital, the official name of the paediatric department at UZ Brussel, is part of a phased renovation of all departments. It was an obvious choice for the hospital to call on Carrier. “UZ Brussel is familiar with our products. We recently upgraded the climate control system at the Oncology Centre,” says Robby Herzeel of Carrier. “We had also previously installed a monoblock system with heat recovery at the Children’s Hospital.”
UZ Brussel’s request therefore had two parts: “On the one hand, they asked us to optimise the existing hydraulic system, while on the other, they wanted to save energy. The original idea was to install the equipment outdoors, but after a thorough study of the project, we abandoned that plan. A water-to-water solution combined with dry coolers on the roof proved to be the most energy-efficient option.”

Free cooling
In practice, this works as follows. Robby Herzeel explains: “We installed two water-cooled chillers indoors, with variable-speed screw compressors and very high efficiencies (type 30 XWV 0880), and four dry coolers on the roof. This system produces chilled water to keep the indoor environment comfortably cool. In addition to a shell & tube evaporator, the indoor installation also includes a water-cooled condenser, connected to the four dry coolers via a closed water circuit. As a result, when the outdoor temperature is low enough, the compressors stop and we can cool the water for the consumers directly using outdoor air. This approach is ideally suited to a continuous process such as the one at the Children’s Hospital, as it allows you to take advantage of the cool outdoor air at night.”

Central control system
Carrier’s system operates according to cooling demand and outdoor temperature. “Our biggest challenge was therefore to develop a central control system that would intelligently coordinate the operating modes. Adding monitoring helps maximise system availability by significantly reducing the risk of downtime. It also allows us to operate the two separate plants as a single system. A staff member can see on a computer screen in the plant room which mode the system is running in at any given time. We monitor the system remotely so that we can intervene proactively if necessary. The intention is also to extend this central control system to all hospital departments.”

The Children’s Hospital is seeing substantial savings on its electricity bill. However, Robby Herzeel stresses that the number of operating hours must be high enough to make a project like this profitable.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeHospital construction and refurbishment
  • SubjectInteriors
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.