Almere | Flevoziekenhuis operating theatres

‘Inverted process pyramid’ delivers user-focused operating theatre and MRI complex
Since December 2018, Flevoziekenhuis in Almere-Stad has had a completely renovated and newly built operating theatre complex, with nine Class 1 operating theatres and an MRI centre. This enables the hospital to carry out all procedures as inpatient care and optimise workflows to accommodate growth in day surgery. The hospital chose to involve users intensively in the design process before finalising the plans. “Everything was based entirely on our wishes and requirements. This inverted process pyramid has delivered results on every front,” says Hans Joosten, manager of Facilities and Care Services.

The complex includes two technical floors.
Founded in 1991, Flevoziekenhuis underwent major expansion in 2008, with a new-build ring constructed around the existing façade. This tripled the hospital’s floor area in the heart of Almere. At the time, the operating theatres were located on either side of the courtyard garden at the side of the hospital complex. The garden was used for the expansion and construction of the operating theatre complex, comprising four new theatres and the renovation or phased closure of the existing ten theatres. “This transformation was necessary to meet higher standards of hygiene and workflow,” says Joosten. “We are seeing more and more procedures coming to us as day cases, and needed flexible operating capacity.
“We now use two theatres as high-turnover operating theatres for cataract surgery, pain management and less complex gynaecological and ENT procedures.” Head of Technical Services Joke Wymenga adds: “Since December 2018, we have had nine Class 1 operating theatres, where inpatient and outpatient flows can be separated. The two high-turnover theatres have their own logistics, allowing day patients to be treated quickly and in a patient-friendly way, with their own holding and recovery room. These theatres can be used entirely for inpatient procedures if needed.”
‘No compromises’
The result of an intensive user-led brief development process, completed before the design process began. “Bottom-up, rather than top-down,” Joosten continues. “So rather than sitting down with designers first and then finding out what users need, we used an ‘inverted pyramid’. We first engaged medical and technical consultancy OKCN and decided what we needed in terms of quality, capacity, logistics and the specific requirements of users.” Wymenga: “OKCN drew up a brief, and the design was developed with the architect and technical adviser into a technical design. The builder then joined the team, and together we developed the design further.” One decision was to give the complex blank façades. However, a screen showing moving images of the outdoors was installed in the operating theatre, alongside a photographic wall covering. “All users are happy with it.”

Changing room on the ground floor.
Opragon system
The new operating theatre complex has a closed, white rendered façade, separate from the existing building. It has four floors, with an MRI centre on the ground floor, including scanners, a coffee room and changing rooms for operating theatre staff. The first floor houses the four new operating theatres. These are equipped with the innovative Opragon air-handling system, which works by maintaining a small temperature difference between the supply air and the surrounding environment. “With Opragon, the workflow can be organised more flexibly than with a traditional plenum system.”
Two technical floors are located above the operating theatre complex. The shell of the building extension is made of concrete, while the technical rooms are steel-framed. “Logistically quite challenging, but nevertheless completed in a year,” says Wymenga. The complex has been designed to allow for the future addition of a hybrid operating theatre, if required.
A tour de force
The construction partners were involved at an early stage, and ultimately worked as part of a construction team. These included architectural practice Wiegerinck, which had already been working with the hospital for some time and was therefore familiar with the building. Koen Arts, managing director and senior partner at Wiegerinck: “The connection to the existing building, and incorporating the requirements into the new environment, presented particular challenges for the building services. It was quite a tour de force. But the hospital’s choices about the process proved effective, enabling everyone to work together successfully on the final result. The rendered façade also allowed us to tie in well with the design of the existing building.” “Early alignment and good preparation were key,” says Joosten. “This created a commitment to quality throughout the design, tendering and construction stages, rather than focusing solely on price. This also made good financial sense: we stayed within budget. We also heard from the contractors that they had enjoyed working on the project, which is not something you hear every day.”

The operating theatres are equipped with the Opragon air-handling system.
Design, construction and validation of an operating theatre complex through a construction team
Four new ‘Class 1 operating theatres’ with preparation rooms have been built within the existing operating theatre complex at Flevoziekenhuis. The client assembled a construction team to design and build the new theatres. This had several major advantages, says Jeroen van Lit, Head of Design & Costing at Van Galen Klimaattechniek, responsible for the mechanical installations.
“The design, integration, construction and validation of the installations could be coordinated in collaboration with the client, construction partners and suppliers. Each discipline was able to contribute its expertise, resulting in a fantastic outcome,” says Van Lit. “For Van Galen, this meant bringing experience from various operating theatre complexes, particularly regarding the positioning of components for future maintenance.”
The HEPA filters were also positioned as close as possible to the operating theatre supply air outlets, with hygiene in mind. “A suspended floor was installed for this purpose. It forms part of the operating theatre’s fire compartment and supports the filter housings. This floor contains entirely ‘dry’ installations, with the water barrier and fire compartment boundary located at the level of the floor above the technical level.”
The upper technical floor houses the many air-handling units and secondary treatment units for each operating theatre and preparation room. Van Galen sourced the Opragon air supply system from Avidicare through Medexs. Medexs also installed the supply system and was responsible for validation. “Careful selection of all the equipment and silencers resulted in a very quiet system.”
Process-led design
“An operating theatre can only function well if the entire operating theatre centre works,” says Janet Vissinga of OKCN. “We began in 2016 by drawing up a spatial and functional brief, first mapping the entire existing operating theatre centre. By looking specifically at patient flows, goods logistics, staff logistics, equipment and the connections to the existing and planned operating theatres, we were able to establish fairly quickly which principles we needed to follow to improve hygiene zoning and optimise processes. We put our ideas on paper, while also sharing them with the design team in brainstorming sessions. This created an integrated vision that had the support of the entire workforce.”
Vissinga stresses the importance of involving people at an early stage. She also calls this moment -1. “This is when a hospital is planning to build or renovate, but has not yet formed a picture of its core processes in relation to the space and zoning required. At this stage, you can work towards an optimal situation and avoid unnecessary design costs. What we often see is that departments have become entrenched in their current ways of working and have not considered how to use floor space more efficiently by organising their workflows more intelligently. At Flevoziekenhuis, we thought outside the box together with users, resulting in a future-proof design that fits within the existing building structure.” And yes, she reiterates, “collaboration really is the key word!”

No design compromises on hygiene.
‘An extensive portfolio for the best care’
When fitting out its operating theatres, Flevoziekenhuis in Almere chose a range of products from the Maquet brand, including mobile Otesus operating tables with universal and specialist table tops, Volista operating lights, various types of pendants from the Moduevo series and a range of operating table accessories. These products are supplied by Getinge, a global provider of innovative solutions for operating theatres, intensive care units, sterilisation departments and life science companies.
The modern operating theatre is the heart of the hospital. It brings together different disciplines, each with unique needs. Multipurpose, multidisciplinary operating theatres can improve efficiency and patient care while keeping costs under control.
To provide the best care for your patients, a good working environment and a healthy financial position, you need a partner who understands your needs and can support you at every step. Getinge provides the equipment, workflow management and clinical therapies that help hospitals and clinicians deliver the best care. “Our extensive portfolio of solutions, services and trusted products, including brands such as Maquet, is brought together under one name: Getinge. With our years of experience and close partnerships with clinical experts, healthcare professionals and medtech specialists, we are ready to support you. One brand, one promise: Passion for life,” says the company.
A business enquiry for OKCN? Get in touch
Who worked on it
Flevoziekenhuis operating theatre complex in Almere
- clientFlevoziekenhuis
- architectWiegerinck
- mechanical installationsVan Galen Klimaattechniek
- luchttoevoersysteem OpragonAvidicare
Keep following this
Get an email when a new story is published. No account needed.
- ProjectFlevoziekenhuis operating theatre complex
- ThemeSafe and reliable healthcare buildings
- SubjectHospitals
- CompanyFlevoziekenhuis
- CompanyWiegerinck
- CompanyVan Galen Klimaattechniek
- CompanyAvidicare
- CompanyOKCN