A fully equipped operating theatre in 3D

New-build and renovation projects are often planned and stored in BIM, then presented to the hospital in 3D.
But adding all the information in the same way and at the right time is not always straightforward. VAMED coordinates this information in the model and adds the medical equipment at an early stage.
A project starts with an idea. A department needs to be renovated, or a new building needs to be constructed, so that the hospital is up to date and ready to provide patients with the best possible care. The first step in a project is to turn ideas for the new building or renovation into a clear plan. VAMED starts by preparing a medical brief. What are the plans for the department? Which treatments need to be provided, and how many patients will be treated at the hospital? These questions are discussed with the hospital’s users. Doctors, nurses, infection prevention specialists and other users are involved in the planning from the outset. This holistic approach starts not with the building, but with the care. The mapped healthcare processes provide VAMED with the input it needs to work with the architect on space planning. Drawing on its international experience in hospital construction, VAMED can advise on the space required for specific rooms, such as an operating theatre, and assess whether the total floor area is being used efficiently.
BIM development and coordination
The plans are developed and stored in the Building Information Model (BIM). The parties responsible for construction and installation add the plans for these elements. BIM coordination is essential to ensure that the model is accessible to everyone, complete and error-free. And as the hospital can continue using the BIM model after the construction phase, it is important to discuss at an early stage which software the model will need to connect with later on. VAMED is used to working with various software programmes to create BIM models and can coordinate the process of creating such a valuable model.

As well as coordination, it is important to ensure that the model is complete. This means that medical equipment must be added to the model alongside information from the construction and installation companies. VAMED can add the medical equipment to the model at an early stage. The information comes from the Digital Roombook, a database containing all the information about the medical equipment, based on the medical brief (photo). These supplier-independent models, created by VAMED’s in-house BIM team, can be added to BIM before a decision has been made on the actual supplier. This benefits the construction process because requirements for the medical equipment, such as connections to medical gases, heat output and water connections, are included in the model at an early stage. This reduces the likelihood of changes being needed later on. In addition, ‘clash detection’ can be used to determine where all the installations should be placed without conflicting with the medical equipment.
A clear picture
Completing the model is valuable not only for construction. The fully equipped model can also be used to show future users what their new department will look like (see photo). By creating a simple QR code, anyone interested can view the plans on a phone or tablet. This provides a good basis for discussions with doctors, nurses and other parties about the placement and functions of the medical equipment.
On budget and on time
Once the model is complete, it needs to be built and equipped in real life. Using the information gathered in earlier phases about healthcare processes and equipment requirements, VAMED can procure equipment that meets the user’s needs. VAMED also oversees its delivery and installation, ensuring that everything is completed on budget and within the specified timeframe.
VAMED is ready to be your partner on more complex projects, such as the construction or renovation of operating theatres, ICUs or radiology departments. This is backed by its experience in planning and BIM, as well as its involvement in more than 1,000 healthcare projects worldwide and in the operation of more than 207,000 beds.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeSafe and reliable healthcare buildings
- SubjectGeneral


















