General

‘Our answer to temporary needs: a mobile or modular CSSD’

Text and images Steelco Benelux

‘Our answer to temporary needs: a mobile or modular CSSD’

The Steelco Mobile CSSD is a fully functional, validated CSSD for temporary use. The choice between a ready-to-use facility (mobile unit) and a modular building depends on how long the hospital expects the renovation to take. Construction projects lasting more than a year often call for a modular solution. However, this does not necessarily mean that a ready-to-use mobile CSSD would not also be suitable.

The capacity required during this interim period also determines the size of the unit. Steelco offers options starting at 70,000 STE (sterilisation units).

The main advantage of using a mobile CSSD is that the hospital retains control over the quality of medical device reprocessing. In addition, the CSSD is not exposed to the disruption and stress of a construction site. Compared with other options, the overall burden on the hospital is the most cost-effective choice, both in terms of workload and financially. 

Thanks to the range of options available within the Steelco group, there is a tailored solution for every customer to ensure work can continue during a major renovation.

Een zakelijke vraag aan Steelco Benelux B.V.? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFaster, more flexible healthcare construction
  • SubjectGeneral
  • CompanySteelco Benelux B.V.
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.