Reference centre in the fight against cancer moves to brand-new building

On 28 November, the Jules Bordet Institute moved to a brand-new site on the Anderlecht campus. The Belgian reference centre in the fight against cancer has swapped its former 35,000 m² premises for a site covering 80,000 m², designed entirely around its various missions in oncology care, research and education. The central hub of a unique cancer centre now has 10,000 m² dedicated to research, 250 inpatient beds and 43 day hospital beds, 8 operating theatres and 6 linear accelerators, to name just a few figures. The comfort and wellbeing of patients and their loved ones, as well as staff, remain the top priority.
Accelerating the diagnosis and treatment of cancer pathologies


“For more than 80 years, we were based at the Porte de Hal in the heart of Brussels, but we have recently moved into our brand-new building on the Anderlecht campus. The number of cancer patients continues to grow, and the technologies and machines also require more and more space. It was also important to be closer to Erasmus Hospital and the ULB Faculty of Medicine, so that we could work even more closely with the research teams,” says Frédéric Coteur, Director of Programming, Organisation and Reconstruction at the Jules Bordet Institute, getting straight to the point. “That is why we have exchanged our former 35,000 m² site for a new building with a floor area of 80,000 m², designed entirely around our vision for oncology care, research and education, both today and in the future.”

Modern architecture with a human-centred vision
The Brussels-Paris joint venture Brunet Saunier, Archi 2000, TPF has succeeded in translating the Institute’s management vision into a clear architectural concept. This enabled it to design a building wholly dedicated to the integrated multidisciplinary approach that is characteristic of the hospital. “This building is easy for patients, visitors and staff to access and navigate. Its basic form is a parallelepiped, built around a central axis from which all vertical circulation takes place. The structure is broken up by six courtyards that allow natural daylight to penetrate deep into the building. This concept optimises patient care pathways, reduces the number of steps for staff and patients, and encourages constant interaction between professionals involved in multidisciplinary care,” the director explains. “On the one hand, this new 9-storey building is highly high-tech, while on the other it also exudes calm and serenity. We paid close attention to selecting the right materials. Wood has been incorporated almost everywhere, with a palette dominated by natural tones. Only high-quality materials have been used in the rooms, bathrooms, operating theatres, research laboratories and other spaces.”

Clinical care centred on the patient
The new Jules Bordet Institute is entirely dedicated to providing the best possible treatment, research and education, but above all it focuses on the comfort and wellbeing of patients and their loved ones. The site has 250 beds for inpatient stays and 43 day hospital beds, of which 172 and 31 respectively are in single rooms. “When designing the hospital, we deliberately started from our patients’ needs. We also gave thought to care pathways. In addition to departments for haematology, medical oncology and surgery, the building has several specialist inpatient units: for elderly patients, for patients requiring supportive or palliative care, a protective unit for blood-forming cell transplants, a specialist intensive care unit, a radiation-protected unit and an inpatient unit where new, innovative cancer treatments are studied,” Coteur continues. “The layout of the rooms and the compact configuration of the entire building are intended to maximise patient comfort and wellbeing, while keeping distances and stress to an absolute minimum. Every room overlooks the surrounding area or one of the courtyards. They all have a shower room and storage space, and give patients a hotel-like experience through ventilation, audiovisual equipment, Wi-Fi, and more. Of course, we also had to consider loved ones and carers. The lounges offer views of the green landscape, and relaxation areas have been provided, all to make waiting more pleasant.”

Ready for today and tomorrow
The new Jules Bordet Institute naturally devotes considerable space to cancer research, 10,000 m² in total. The 4th floor is entirely dedicated to translational cancer research. Here, researchers aim to improve their understanding of cancer pathologies so that they can treat them more effectively. The research laboratory platform is therefore equipped with state-of-the-art facilities for tissue imaging, cell biology, microdissection and tumour genome sequencing. Investment is also being made in equipment to develop new, more effective cancer medicines. The floor’s configuration encourages multidisciplinary working and consultation between researchers and doctors.
“Our new building was designed to accommodate today’s and tomorrow’s cutting-edge technology,” Coteur concludes. “Among other things, the Radiotherapy Department has an MRI-LINAC, a first for Belgium, 3 other new linear accelerators and 1 upgraded one, the Gamma Knife, the Mobetron and a brachytherapy device. The Radiology Department also uses the latest generation of CT scanners, MRI scanners, mammograms, ultrasound scanners, and more. In addition, the Nuclear Medicine Department is equipped with 2 SPECT-CT scanners and 2 PET-CT scanners, as well as a radiopharmacy for producing radiotracers. Our move will only strengthen our position as a reference centre in the fight against cancer!”
Question about this story? Ask your question
Wie aan Jules Bordet Instituut werkte
- architectBrunet Saunier: Archi 2000: TPFIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectJules Bordet Instituut
- SubjectGeneral
- CompanyBrunet Saunier – Archi 2000 – TPF


















