General

ZorgSpectrum’s new rehabilitation centre to be built using fully modular construction

ZorgSpectrum’s new rehabilitation centre to be built using fully modular construction

On 20 February 2020, De Meeuw and ZorgSpectrum signed the contract for the design and construction of the Ervenstaete site. The new centre, due to open in autumn 2020, will provide rehabilitation care for 30 people, with dedicated spaces for physiotherapy and treatment. It is being built directly next to the existing Het Houtens Erf building. To ensure the building can be adapted in the future, the partners have opted for fully modular construction. This will allow it to be adapted to meet changing needs.

Property manager Johan Gubbens: “This project will help us address growing waiting lists for inpatient care and improve the flow of patients from hospitals. In view of demographic trends, we expect more older people to need recovery and rehabilitation care. It is important that we can use the building flexibly and are not limited in what we can do with it. That is why we have opted for this modular design. At a later stage, the building can be easily dismantled and, if necessary, put to use at a new location. This construction method will also help reduce nitrogen emissions during the building period.”

Huiselijkheid in combinatie met circulariteit.

On 20 February 2020, De Meeuw and ZorgSpectrum signed the contract for the design and construction of the Ervenstaete site.

A supportive rehabilitation environment

The new centre has a large physiotherapy room equipped with all the latest equipment. All activities are focused on rehabilitation and helping people return home with confidence, where they can resume their independent lives while taking account of any lasting physical limitations. Marja de Graaf, rehabilitation manager: “We take into account all the factors that play a role in rehabilitation. Alongside intensive support from all the care professionals, we pay close attention to individual dietary requirements. Patients can rest in a single room and relax with family and visitors in the welcoming surroundings of the Grand Café.”

Energy-efficient

Although the building will only be in temporary use, it has been designed to have a permanent appearance. It fully meets the requirements for new-build construction and, where possible, the so-called BENG requirements (energy standards). The building has no gas connection and will be equipped with a heat pump system. The energy it needs will be generated by PV panels on the roof.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectErvenstaete
  • ThemeFaster, more flexible healthcare construction
  • SubjectGeneral
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.