Construction projects

Jessa brings care campuses together in a green setting

Text Koen MortelmansImage Jessa Ziekenhuis

Jessa brings care campuses together in a green setting

Responding to healthcare trends

Jessa Hospital plans to bring its three existing care campuses together in a new healthcare park on the Salvator Plus Site in Hasselt. After the winning competition design was announced in March 2021, little was heard about the construction plans for some time, but the project is now moving forward.

“A huge amount of work has been done behind the scenes to develop a preliminary design with broad support,” says managing director Dr Yves Breysem. “The layout of the entire site has largely been mapped out. The car-free park surrounding the hospital is a real eye-catcher and a major asset for Hasselt. The hospital design will be refined further over the coming months.”

The entire site covers 20 hectares. The masterplan includes an area for an education campus, allowing healthcare training courses to be run close to the new hospital. No concrete plans have yet been drawn up for part of the site. In time, Jessa may expand there.

The construction site is located alongside the Hasselt ring road and the E313. The design team places the new hospital on the southern side of the site and transforms the area into an urban-edge park, potentially forming part of a green-blue recreational network. A landscaped underpass for cyclists and pedestrians beneath Luikersteenweg plays a key role in linking the new hospital, the city and the landscape. The woodland is a central feature of the healthcare and city park.

Water management

The existing stream will be retained and put to better use as part of an integrated, sustainable water system. By making the area better suited to retaining and infiltrating rainwater, the site will also help address the problem of drying out in Flanders. The park will feature water features, small walking trails, a sunbathing lawn and, immediately beside the hospital, a peaceful, shaded garden. The ‘castle garden’ of the former ’t Hollandt castle will be retained, respecting its original character. The high-rise building announces the city along the motorway side. On the park side, the building is designed to suit the scale of the park. Motorists will be directed around the site to the main car park, alongside the E313 on a service road that is to be widened and connects to the central entrance. 

High-rise on the city side, low-rise in the park.

Distinct zones for different types of care

The hospital is divided into three sections according to type of care. The 18-storey tower is for patients admitted to hospital for a short period or in an acute situation, for example in maternity, intensive care, internal medicine or surgery. The horizontal ‘park wing’ is for patients who need to stay in hospital for longer periods or very frequently, such as those receiving geriatric or palliative care, (child and adolescent) psychiatric care, rehabilitation, treatment at the oncology centre or dialysis. The third section, the medical and technical ‘plinth’, forms a hinge between the two wings and serves patients requiring urgent care, for example in the medical imaging department and operating theatres. A central hall connects the three sections.

Anticipating healthcare trends

“The design allows for plenty of flexibility, both at room level and across entire departments,” says medical director Dr Jos Vandekerkhof. “Digitalisation will also mean that, in future, people will visit the hospital noticeably more often, but for shorter periods. Under this design, it will be relatively easy to reduce one service and expand another, thanks to the optimal interchangeability of available spaces. The design takes account of future developments in healthcare, with the intended number of inpatient beds lower than it is today. Every trend is reflected in the design. For example, there will be combined departments, with a geriatric section linked to a number of inpatient departments. There will also be more space for rehabilitation and an integrated out-of-hours GP service, and the design provides for more places in the day hospital.”

Construction cost

The construction cost is estimated at 500 million euros (excluding VAT) and will be funded through the hospital’s own resources, loans, government subsidies and a construction fund set up by the medical staff. The hospital is scheduled to open in 2031.     

Question about this story? Ask your question

Who worked on it

Zorgpark Salvator Plus in Zwartewaterland

  1. ClientJessa Ziekenhuis
  2. MasterplanOsar
  3. MasterplanRobbrecht en Daem architecten
  4. MasterplanBlauwdruk Stedenbouw
  5. MasterplanLama Landscape
  6. MasterplanTransport & Mobility Leuven
  7. MasterplanTractebel Engineering

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectZorgpark Salvator Plus
  • SubjectConstruction projects
  • CompanyJessa Ziekenhuis
  • CompanyOsar
  • CompanyRobbrecht en Daem architecten
  • CompanyBlauwdruk Stedenbouw
  • CompanyLama Landscape
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.