PI Care Centre: exemplary in many ways

The correctional facility in Scheveningen has been expanded with a Judicial Centre for Somatic Care. It serves both as a correctional facility and as a centre for medical treatment and nursing care. The highly complex programme was efficiently accommodated across 3,300 square metres: cepezed and cepezedinterieur designed a healing environment filled with natural light, featuring soft colours, plenty of wood and views of greenery through large, bar-free windows. The design was commissioned by the Central Government Real Estate Agency for consortium dpcp (du Prie and cepezedprojects).

Given its proximity to two Natura2000 areas, the care centre was built with low nitrogen emissions. From the outset, the shared decisions were guided by the target of a maximum deposition of 0.005 mol N/ha/year. Low-nitrogen construction starts at the design stage: using electric transport and construction equipment calls for manageable, lightweight prefabricated elements. In addition to meeting the nitrogen target, the kit-of-parts construction method is also sustainable because it is reusable and because the large quantity of prefabricated timber elements reduces CO2 emissions.
The Judicial Centre for Somatic Care recently opened, following a two-year construction period. Despite the challenges, including a shortage of available electric equipment, the parties involved remained committed to the nitrogen target, which they achieved. This made it possible to build an institution in Scheveningen, within a high-security environment and with minimal disruption, that the Custodial Institutions Agency already considers a model of ‘humane accommodation’.

Question about this story? Ask your question
Who worked on it
- Primary client:Rijksvastgoedbedrijf
- Contractual client/developer:dpcp (du Prie / cepezedprojects)
- Interior design:cepezedinterieur
- Landscape design:Buro Sant en Co landschapsarchitectuur
- Structural engineering:IMd Raadgevende Ingenieurs
- Building services consultancy:Overdevest adviseurs
- Building physics, fire safety and nitrogen deposition:LBP|SIGHT
- Main contractor:du Prie bouw en ontwikkeling
- Electrical installation contractor:Steegman Elektrotechniek bv
- Mechanical installation contractor:Putman bv
- Logistics on and around the construction site:Timmers. Praktische Bouwlogistiek
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects


















