Residential care & nursing homes
A residential care complex with an open character
Text Gerrit TenkinkImage De Bruin Architecten, Adviesbureau Pentha Rho, Aannemersbedrijf Dons en Troost

How do you create a welcoming, future-proof residential care complex for older people, with input from residents and staff and a strong desire to move residents only once, from the old building (on the same site) to the new one? Ask Het Wooldhuis in Heino. Here, contractor Dons en Troost built a new home for ninety older people on behalf of Zorgspectrum Het Zand, complete with facilities including a kitchen, restaurant and spaces for a range of support services, such as an activity room, hair salon and physiotherapy room.

Construction began in June 2021. Just under two years later, in April 2023, the first residents were handed the keys to their studios. Janine Noordhuis, a member of the Executive Board of Zorgspectrum Het Zand (of which Het Wooldhuis is part), Peter van Heerde, strategic housing adviser and process manager at consultancy PentaRho, and Willem Slager, project manager at contractor Dons en Troost, look back on an intensive period.

Safe freedom
Noordhuis explains who the complex serves: “We provide nursing home care here for older people, most of whom come from the immediate area. That means you want the home to be part of the neighbourhood too. Our restaurant, for example, is also open to local residents. Our residents can leave the grounds. That is a deliberate choice, which we make together with staff and clients or their families. Safety and quality of life come first, so we have to find a balance. When necessary, we use GPS trackers and we have natural barriers, but we do not want to lock our residents in. We call this ‘safe freedom’.”
For the contractor, too, providing this safe freedom was one of the bigger technical challenges of the project. Slager says: “We met several times with the client’s IT team, Unica as the installer and us as the party responsible for the construction work. How could we design the access systems to give residents as much freedom as possible while keeping them safe? In the end, additional glazed entrance screens with automatic doors were installed, and some residents were equipped with a GPS tracker. We gained a lot of knowledge in this area, which will also help us on a future project.”

Technology
The new Wooldhuis has ninety studios (35 m2), each with a wet room, kitchenette and a single-person combined living and bedroom. From a technical perspective, the building meets all current requirements. The rooms and studios can be ventilated, heated and cooled independently. The building is almost energy-neutral, thanks to 510 solar panels on the roof. Various technical features have also been incorporated to make it as comfortable as possible. One of these is biodynamic/integrative lighting, which adjusts the light intensity to residents’ day and night rhythms.
External advice
In 2019, Noordhuis engaged consultancy PentaRho, bringing strategic housing adviser Peter van Heerde into the picture. Noordhuis says: “The choice to bring in an external consultancy was an obvious one. It gives you access to an experienced party with knowledge of these kinds of processes. And sometimes you need a party that can offer valuable advice, but is also willing to be honest when something cannot be done. Construction and process management are specialist fields. Meetings with the authorities and architect, selecting the right contractor, and involving clients, family members and local residents all require considerable expertise. Involving staff and clients is particularly important. After all, it is ‘their’ home.” This was right up Van Heerde’s street. “We specialise in the non-profit sector, so these questions were familiar to us. We set up a project organisation, including the associated steering, project and development groups, with representatives from among the clients, the client council, care professionals and staff.”
“We had two important requirements,” Noordhuis continues. “We wanted residents to move only once. So they had to remain in the old building while the new one was being built on the site. Our brief to the architect was to design a care building with facilities for the neighbourhood, but also a future-proof building. If we want to put the building to a different use, that should be relatively straightforward. The studios have been designed so that two can be converted relatively easily into one apartment for a two-person household.”
A complex puzzle
The first requirement in particular, that residents should move only once, presented the contractor with quite a puzzle. Slager explains: “We divided the construction into three phases.
We built phases A and B on either side of the existing building, after which the residents could move. The old building was then demolished, and we continued there with phase C, which includes the restaurant and kitchen. Phase C now connects A and B.” Noordhuis says: “We did have some concerns about demolishing the old building. It was only one and a half metres from the new one. What would the impact be on our residents? In the end, it was not too bad. In fact, some residents loved watching the old building being demolished, right up close. So we deliberately did not put up screens during the demolition work.”
Building together
Contractor Dons en Troost was selected on the basis of price and expertise. Van Heerde says: “We were keen to build together. It was not a turnkey contract. We held regular meetings, weekly at first and then every two weeks, and there was a site meeting every month, which subcontractors also attended when requested. Unica was appointed as a separate contractor for the electrical and mechanical services. Dons en Troost remained the main contractor, responsible for the progress of the overall project.” Slager says: “Of course, we did not know in advance that we would be building during a very difficult period. First came the after-effects of Covid, then the war in Ukraine, which led to problems with delivery times and the availability of materials. But in the end we got through it, because everyone showed understanding for each other’s situation. That kept the atmosphere positive, and ultimately we achieved the best result together.”
Een zakelijke vraag aan Unica? Get in touch
Wie aan Het Wooldhuis werkte
- ventilation unitsClimaRad BVMentioned in ‘Optimal control thanks to ventilation units at Het Wooldhuis in Heino’
- clientZorgspectrum Het ZandIn this story
- main contractorDons en TroostIn this story
- architectDe Bruin ArchitectenIn this story
- consultancyPentaRhoIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectHet Wooldhuis
- ThemeHousing with care close by
- SubjectResidential care & nursing homes
- CompanyUnica
- CompanyZorgspectrum Het Zand
- CompanyDons en Troost
- CompanyDe Bruin Architecten
- CompanyPentaRho