Klaverveld residential care centre expands with 30 new places
Text Petra Broeders Beeld Atelier Jo De Rammelaere

The residential care centre at the Klaverveld care campus in Zedelgem has been expanded with a new building to accommodate 30 additional residents. The new building was delivered using the Design & Build model. The result is a warm, sustainable building that supports care without dominating its surroundings.
The client’s brief was clear: to create extra capacity where living, wellbeing and care come together naturally. The programme was logically divided, with logistical and staff facilities on the ground floor and a new living group on the first floor. The latter comprises 15 single rooms, five double rooms and five palliative care rooms. The palliative care unit has its own entrance and more intimate living spaces.
“The starting point was a homely, human-scale residence, integrated into a pleasant and active neighbourhood,” explains Toon Vandewalle of M4 architecten en ingenieurs. “Living takes centre stage, while care is deliberately kept in the background.” This vision is reflected in small-scale living groups, clear circulation routes and a strong connection with light and greenery.

Architecture that brings a sense of calm
Despite its extensive programme, the building feels small in scale. This is the result of a fragmented massing strategy and a restrained palette of materials. Light brick, subtle accents in the bond pattern and bronze-toned balustrades give the building a warm, contemporary appearance that complements the existing residential care centre and the surrounding neighbourhood. Large windows, terraces and transparent balustrades strengthen the connection with the outdoors. “Sightlines, daylight and the experience of the changing seasons are essential to the wellbeing of residents and staff,” says Vandewalle. “The gardens and walking routes are a structural part of the care concept, encouraging social interaction, movement and tranquillity.”

Design & Build as a catalyst
The choice of Design & Build proved decisive in the course of the project. As main contractor, Vandenbussche took the lead and assembled an integrated team with M4 and the engineering consultancies, including BeHeCON. “Because expectations were clear on all sides and the Schedule of Requirements was very comprehensive, we were able to move quickly from design to permitting and construction,” says Pieterjan Croene, project manager at Vandenbussche.
The existing residential care centre remained operational throughout the works. This required strict logistical scheduling and clear site protocols. However, because the new building was constructed separately from the existing one and is connected to it only by a corridor, daily operations were not disrupted.

Speed with quality assurance
To meet the ambitious schedule without compromising quality, Vandenbussche made extensive use of lean methods. The Last Planner System actively involved subcontractors in the planning process through sticker sessions, improving collaboration and efficiency. The team also applied Quality at Source and micro-zoning: completing one zone first and evaluating it with the client, in order to establish the quality standard for the rest of the site. The 5S working method ensured that the site remained orderly and clean. Sustainability was a key consideration in the design and construction of the residential care centre. The building combines high-performance insulation with renewable energy technologies such as solar panels, ground-source heat exchange and a heat pump. A mechanical ventilation system with heat recovery and the collection and reuse of rainwater also help ensure a comfortable, energy-efficient building.
This approach delivered measurable results. The target E-peil of E22 became an achieved E-peil of E16, an exceptionally low figure for a residential care centre. The blower-door test returned a value of 0.8 m3/h/m2, thanks to meticulous detailing and finishing. The project was handed over after 224 working days, with just two items outstanding.
The extension is now in use and has become a natural part of the care campus. “This project shows how people-centred care architecture can go hand in hand with a tight budget, high energy performance and rapid delivery,” concludes Croene.

Facts & figures
- Client: Zorg en Welzijn Zedelgem vzw (Zedelgem)
- Architect: M4 architecten en ingenieurs (Wetteren)
- Main contractor: Vandenbussche (Aalter)
Question about this story? Ask your question
Who worked on it
Klaverveld in Zedelgem
- ClientZorg en Welzijn Zedelgem vzw
- ArchitectM4 architecten en ingenieurs
- main contractorVandenbussche
- engineering consultancyBeHeCON
Keep following this
Get an email when a new story is published. No account needed.
- ProjectKlaverveld
- ThemeHousing with care close by
- SubjectResidential care & nursing homes
- CompanyZorg en Welzijn Zedelgem vzw
- CompanyM4 architecten en ingenieurs
- CompanyVandenbussche
- CompanyBeHeCON