Support is the first foundation of every residential care building
Text and images Robert Kromhof

Delivering residential care buildings is becoming increasingly complex. Stricter regulations, higher quality requirements and rising construction costs are usually cited as the causes. Less attention is paid to a factor that is at least as decisive for a project’s success: support.
Project management typically focuses on organisation, money, time, information and quality. In healthcare construction, there is a sixth aspect to manage: support. Not as a communications add-on at the end, nor as an automatic consequence of good design, but as a task that requires attention from the earliest exploratory stage.
Support cannot be engineered in full. Even after a careful process, interests may conflict and opposition may persist. However, the conditions for trust, involvement and an acceptable decision-making process can be deliberately put in place.
Is a new building really needed?
Every residential care project should start by asking whether a new building is really the best solution. After all, new-build construction is the most far-reaching way of addressing an accommodation problem. In the 1960s and 1970s, many older people were housed in large-scale residential facilities on the outskirts of towns and villages. Shops, services and social contacts were consequently not always within walking distance. That history shows that a new building does not automatically create a better living environment.
Renovation, an extension, a replacement building on the same site or the conversion of an existing building in the neighbourhood may be more suitable alternatives. The choice should therefore not be based solely on available land, building volume and investment costs. The daily lives of future residents must also be taken into account. Are shops, public transport and community facilities nearby? Is there space for greenery, meeting others and physical activity? What impact will the project have on traffic, parking, noise, privacy and the surrounding area? Are there risks relating to flora and fauna, soil quality or external safety?
Where there is a genuine risk of problems, it is worth carrying out certain surveys during the initial phase. A quick scan of flora and fauna or an initial traffic analysis costs relatively little compared with a project that later comes to a standstill. At the start of the process, a plan can still be changed or abandoned. The more time, money and reputation have been invested, the harder that becomes.

The illusion of certainty
During the exploratory phase, clients understandably try to obtain as much certainty as possible. Feasibility studies are drawn up, risk analyses carried out and financial scenarios modelled. These tools are essential, but their predictive value is limited. No one knows exactly how care needs, regulations, domotics, funding and staff availability will develop over the next twenty years. Extensive reports and spreadsheets can therefore suggest a greater degree of certainty than actually exists.
A solid project foundation is not created simply by commissioning more research. It is just as important for the initiator to learn to see things from the perspective of all the parties involved: residents, relatives, staff, client councils, the local authority, neighbours, funders and other stakeholders. There is no fixed step-by-step plan that automatically creates support. Every project has its own setting, history and balance of interests. The quality of the process therefore depends on the ability to identify interests early and continually reassess them.
Start with residents’ daily lives
A residential care building should not start with a standard Schedule of Requirements. The starting point is the life future residents should be able to lead there. This means looking beyond a list of floor areas, functions and technical requirements. The experience of the space, familiarity, safety, independence, privacy and opportunities to meet others must also be considered.
A residents’ panel can provide valuable information. For example, it could include residents with experience of recent new-build and renovation projects, alongside residents of the existing site. Relatives, client council members and care professionals can also be involved.
The panel is not representative of all future residents and must not be used to legitimise decisions that have already been taken. It is a way of bringing experiences, needs and concerns to light at an early stage. Additional methods are needed for residents with dementia, severe learning disabilities or communication difficulties. In such cases, observations, conversations with relatives, mock-ups and following daily routines often provide more useful insights than a standard meeting. The central question is not only which rooms are needed, but above all what residents should be able to do and experience there every day.

Do not present a finished vision straight away
Initiators often think that support can be secured by presenting a developed design with persuasive artist’s impressions. Such a presentation may appeal to board members or funders. For neighbours, future residents and local authority advisers, it can have the opposite effect. A plan that looks final gives the impression that the key decisions have already been made. People are formally asked for their views, but in practice there seems to be little room to influence the outcome. This fuels mistrust.
A plan has a better chance of winning support when it is seen to develop in clear stages. At first, discussions can focus on principles, options and conditions. Only then should they move on to urban design choices, building volumes and a detailed design. At this stage, it must also be clear what is and is not open for discussion. Participation without clearly defined scope for input leads to disappointment. For example, if the number of care places, the location or part of the building volume is fixed, this should be stated openly. At the same time, it must be clear which aspects stakeholders can genuinely influence.
Different parties, different roles
Many parties are involved in healthcare construction, but they do not all have the same role. Future residents and staff will use the building. Neighbours are stakeholders who may be affected in their living environment and quality of life. Local authority officers advise and assess proposals within statutory and policy frameworks. The local authority’s executive takes formal decisions. Funders and regulators assess feasibility and continuity. It is therefore inaccurate to treat all these groups simply as co-decision-makers. Their interests, responsibilities and formal powers differ. A stakeholder analysis shows who has influence, who is affected and who has knowledge essential to the project. This provides the basis for deciding who should be involved, when and how.
It is striking how easily future residents fade into the background in decision-making processes. Technical, financial and planning interests are generally well organised. The interests of vulnerable older people and people with learning disabilities are far less so. That is precisely why their daily lives, not the building, must remain the starting point.

Opposition is not necessarily unreasonable
New-build projects almost always create uncertainty. Neighbours may be concerned about losing their views, reduced privacy, falling property values, increased traffic, parking problems or the loss of green space. Such objections should not automatically be dismissed as resistance to change. Neighbours assess a plan from a different risk perspective than the initiator. Where the initiator sees opportunities, they may see mainly loss or disruption. Some concerns are emotional, while others are factual and well founded.
Opposition does not necessarily mean a plan is bad. It may also show that people feel strongly connected to their surroundings. The right response is not to rebut objections as quickly as possible, but to find out what lies behind them. Is traffic really the main problem, or is there mainly mistrust because previous promises were not kept? Is the objection about building height, or about the fear of losing privacy? Only once the underlying interests are clear can it be decided which change, explanation or agreement would be useful.
No token participation
Information evenings sometimes present a win-win situation even though the plan is already largely fixed. The meeting is then mainly intended to get the project through the decision-making process without major changes. This is transparent. As soon as criticism arises, initiators become defensive because changes cost time and money. Neighbours then become equally entrenched in their position. Pushing through a plan without serious dialogue generally increases opposition. This does not mean that every objection must be accepted or that complete consensus is achievable. But it must be clear that arguments are examined seriously and that participation sometimes does lead to changes.
Concessions are usually needed in area development and healthcare construction. They need not be symmetrical, but the process must be transparent and credible. If a proposal cannot be adopted, the reasons must be clearly explained.

Listen before you communicate
Large-scale information evenings are not always the best way to gather information. Drop-in sessions and one-to-one conversations often leave more room for nuance. In particular, early personal contact is usually more valuable than a general letter or presentation when it comes to neighbours whose properties directly adjoin the site.
Building support starts with listening. Rather than responding or defending straight away, first seek to understand how others view the plan. Digital tools can help. An interactive website or digital platform can give residents the opportunity to ask questions, raise concerns and make suggestions. Such a platform should not be used mainly to broadcast large quantities of information. Its real value lies in gathering, organising and responding to feedback from the local community.
Ultimately, it helps to make shared interests visible. Most of those involved want a pleasant neighbourhood, good care, a safe living environment and careful use of scarce space. This does not eliminate conflicts of interest, but it does provide a more constructive starting point for discussion.
The real test begins after handover
A project is not successful simply because the building has been technically completed, has stayed within budget and meets the Programme of Requirements. The real test begins when residents move in, staff start work and family and friends come to visit. Can residents find their way around? Do they feel at home? Do spontaneous encounters take place? Do circulation routes and communal spaces work as intended? Is the staffing level viable? How does the building function in relation to the neighbourhood? A post-occupancy evaluation should therefore be a standard part of the project. Not only to address shortcomings, but also to capture lessons for future developments.
A residential care building can be delivered on time, within budget and in line with all technical requirements, yet still fall short in social terms. That is why community support should not be relegated to a communications plan at the end of the process. It is the sixth control aspect of healthcare construction and requires sustained attention from the initial feasibility study onwards.