Residential care & nursing homes
Future-proof care building in Vlaardingen

A new residential care building for Cedrah opened this summer on the corner of Churchillsingel and Holysingel. The Christian care provider now has 44 care studios spread over four floors (residential groups), plus a residential group with eight care studios on the ground floor. Communal facilities are located on the ground floor, while each residential floor has its own lounge. The residents are older people with (advanced) dementia. Designed to meet the BENG energy performance requirements, the care building is prepared for conversion to conventional housing in the future, with studios that can also be combined.

The new building is part of Uitzicht residential care centre, which previously comprised a care building with 69 places and a residential building with 89 apartments. To bring both buildings, dating from 1974, into line with current sustainability requirements and residents’ needs, it was decided to renovate the residential building and construct the new building right next to the care building. After the new building was handed over, Slokker Bouwgroep vestiging Breda immediately began demolishing the old, eight-storey care block. This will make way for a new link building with a restaurant and a large kitchen, connecting the old and new buildings.
Bright red and pebble grey
The new building on Holysingel represents a major improvement for the neighbourhood. The eight-storey care building, with its unremarkable 1970s appearance, has made way for a bright red brick volume. The new building is three storeys shorter and has many more windows. The frames are finished in a light pebble-grey shade. Textured brickwork in places and two substantial curtain walls add further variety, and contrast with the old building. The inscription on the first pile read: “A house is built with bricks, a home with love”. The designers at RoosRos Architecten have certainly translated this motto well into the new Uitzicht, and a prominent site deserves no less. Erik van der Sluijs, construction project manager for care provider Cedrah, agrees: “Although I expected the brick colour to be more varied, the overall result, with its many stepped sections and textured surfaces, fully meets our expectations.”

Budget
The first pile, bearing an inscription, was driven into the ground on 28 April 2020. Johan Ruijzing, project manager at Slokker Bouwgroep vestiging Breda: “A frame of concrete walls and wide-slab floors was built on the foundations, with timber-frame and traditional brickwork façades. Given the strict fire regulations in particular, concrete was the best solution for this building. We were able to discuss these kinds of considerations in detail with the project team. Budget is a key factor in care projects, and you always want to deliver a solid result without having to make cuts in the wrong areas.” Van der Sluijs agrees: “In a process like this, for example, you choose uPVC window frames instead of more expensive aluminium ones. uPVC frames are now so good that the difference from timber or aluminium is barely visible. That made it possible to spend a little more on an attractive brick outer leaf. If you make savings there too, there is very little left to work with and the result is a very flat-looking building.”
Similar trade-offs are made for the interior. Van der Sluijs: “We had scan wallpaper installed throughout. It is good quality and relatively inexpensive, and can easily be painted over. That leaves room to spend on other things for the residents. The bathrooms, for instance, are attractively tiled in two colours, and there are beautiful old photographs of Schiedam and Vlaardingen throughout the building. Good-quality materials have been used everywhere. They may cost a little more now, but require less maintenance and last longer.”
Sustainable building services
Uitzicht has perhaps made its greatest progress in sustainability. Ruijzing: “The new building meets the BENG standards and has no gas connection. The entire building is heated by an air-source heat pump, connected to underfloor heating in every room. The studios have room thermostats, allowing residents to adjust the temperature a little, in a familiar way. The ventilation system preheats the air in winter and precools it in summer.” The building is also fitted with the necessary care technology. Van der Sluijs: “Clients carry a panic button and can only access the areas assigned to them. There are enough data points built in to add further facilities, such as camera surveillance.”

Building for the future
Designing buildings to accommodate people throughout their lives appears to be a growing trend in care. On the one hand, this means creating care complexes where residents can move from rented or owner-occupied housing, through a setting providing light care, to departments designed for intensive care, without having to leave their familiar neighbourhood. Cedrah sites such as Amandelhof in Capelle aan den IJssel and Uitzicht provide for this progression. On the other hand, buildings themselves need to be adaptable over time. Ruijzing: “The spacious studios at Uitzicht comprise a living room, bedroom and bathroom, with a total area of around 45 m2. Recesses in the reinforcement of the concrete walls mean the building is prepared for the care studios to be converted into conventional apartments, and for two studios to be joined to create a larger apartment.”

Waiting list or decline
A flexible building is important because the future is unpredictable. Van der Sluijs: “The population continues to age, but there are significant regional differences, particularly among our Christian target group. At Amandelhof in Capelle, we have a waiting list of several dozen people. Here in Vlaardingen, numbers are actually falling somewhat. Based on market research and regional discussions, the decision was made to reduce Uitzicht’s care capacity from 89 to 52 places, with other sites taking on some additional capacity. A flexible building means that, in time, you can scale back further if necessary, and convert and rent out parts of the building.”
Slokker has meanwhile made progress with demolishing the old care building. Ruijzing: “The work was delayed somewhat because of the presence of asbestos. We used the construction holiday to make up for some of the lost time. The fact that the old building is only a few metres from the new one makes things especially challenging. This will cause some disruption for residents, but we are doing everything we can to keep it to a minimum.”
Facts and figures
Client
Cedrah, Barendrecht
Design
RoosRos Architecten, Oud-Beijerland
Consultants
IMd Raadgevende Ingenieurs, M3E Groep and Marsaki
Construction
Slokker Bouwgroep vestiging Breda
Question about this story? Ask your question
Who worked on it
Cedrah Vlaardingen residential care building in Vlaardingen
- ClientCedrah
- DesignRoosRos Architecten
- AdvisersIMd Raadgevende Ingenieurs
- AdvisersM3E Groep
- AdvisersMarsaki
- ConstructionSlokker Bouwgroep Breda office
Keep following this
Get an email when a new story is published. No account needed.
- ProjectCedrah Vlaardingen residential care building
- ThemeHousing with care close by
- SubjectResidential care & nursing homes
- CompanyCedrah
- CompanyRoosRos Architecten
- CompanyIMd Raadgevende Ingenieurs
- CompanyM3E Groep
- CompanyMarsaki