Residential care & nursing homes

Striking new building enhances the experience at residential care campus undergoing major transformation

Text Tim Janssens Beeld Robbe Theunis, assar architects, part of Sweco

Fase 2 van de nieuwbouw van WZC Sint-Jozef volgt het bochtige traject van de Koningin-Astridlaan en kreeg een opvallende sikkelvorm.
Fase 2 van de nieuwbouw van WZC Sint-Jozef volgt het bochtige traject van de Koningin-Astridlaan en kreeg een opvallende sikkelvorm.

Residents of WZC Sint-Jozef in Lier received an early end-of-year gift at the beginning of December. After an L-shaped block with 66 rooms was built in the first phase, a further 54 rooms were added in the second, housed in an adjoining new-build section. The new building follows the winding route of Koningin-Astridlaan and therefore has a striking crescent shape. This architectural and construction challenge was tackled particularly efficiently, partly through the clever use of BIM and the Engineering & Build model.

The WZC Sint-Jozef site has been undergoing a major transformation for several years. Following the D-block, a new wing for residents with dementia, assar also drew up an overarching masterplan for care organisation De Medemens, focused on small-scale living, spatial logic and high-quality outdoor spaces. The first expression of this plan is the adjoining new building, which has recently been completed and was brought into use on 3 December. “As the site developed historically around a centrally located monastery, with the buildings set back from the street, the residential care centre did not initially have pleasant outdoor spaces of its own,” says project architect Robbe Theunis. “That is why we chose to concentrate the buildings along the edges of the site, allowing the ageing blocks in the central area to make way for a green courtyard garden. The D-block set the tone, and the new building, which extends towards Koning-Astridlaan and creates a kind of embracing gesture, fits seamlessly into this approach.”

assar created a welcoming hotel atmosphere with warm wood textures and carefully chosen colour accents.

Designed entirely around small-scale living

Phase 1 of the new building, completed in 2024, comprised an L-shaped section and a square central core. With its distinctive curved façade, the crescent-shaped volume of phase 2 completes the picture. “The new building now contains a total of 120 rooms across three levels, each accommodating one unit of forty rooms. With the day rooms and shared facilities (medication room, nurses’ station and servery kitchen) located centrally, smaller groups of twenty rooms are arranged on either side. The spatial layout is therefore designed entirely around small-scale living, without resulting in long walking distances or the need for additional staff. It is also worth noting that, as in phase 1, there are six ‘luxury rooms’ with a separate sitting area. Finally, a classroom for adult education provider KISP has also been fitted out, with space for mock-ups of care beds,” Theunis explains.

Specific structural detailing

He says the rounded contours of phase 2 presented the biggest construction challenge. “The rooms are arranged in a fan shape along the curved corridor, which makes them slightly trapezoidal. Yet building materials such as floor tiles and ceiling tiles are, of course, rectangular. The window frames and panes of glass are also straight, so the façade was built in segments that are not visible. This was worked out in close consultation with the contractor, as it was closely linked to how and in what sequence the shell was constructed. Fortunately, once the necessary decisions had been made, everything proceeded very quickly and efficiently. We had already done a great deal of preparatory work ahead of phase 1, made clever use of BIM, and the contractor and engineering consultancies were able to get started sooner under the chosen procurement model (Engineering & Build), saving considerable time during construction.”

The rooms are arranged in a fan shape along the curved corridor, which makes them slightly trapezoidal.

Matching façade finishes and interior design

In both its architectural design and spatial layout, phase 2 of the new building builds on phase 1. The façade is identical in construction, with light-coloured brick, gold-coloured external joinery and projecting concrete frames with terraces at the rest points along the corridors, …. The same applies to the interior concept, which assar developed based on De Medemens’ corporate identity. “We created a welcoming hotel atmosphere with warm wood textures and carefully chosen colour accents,” says Theunis. “Each floor also has its own colour and name: orange for Pallieter (ground floor), green for Ravenstein (first floor) and blue for Belfort (second floor). These colours feature not only in shared areas such as the day rooms and communal bathrooms, but also around the bedroom doors. The doors are also fitted with an attractive light and a nameplate, making each one feel like a separate ‘address’. To provide sufficient contrast for people with visual impairments, dark door frames and skirting boards define the spaces clearly. For the same reason, the dark bathroom pods are fitted with white accessories.”

The interior design advice covered even the smallest details. From the signage to the upholstery, everything follows the same colour palette. “Textures were also carefully selected to create a tactile, multi-sensory experience. Flat painted feature walls are paired with textured wallpaper, smooth worktops have a marbled splashback, and upholstered chairs are matched with plain side tables. Even the illustrations that greet you as you leave the lift were designed by us in the style of iconic Lier author Felix Timmermans.”

On to the next phase

Nothing has been left to chance outdoors either. A strip of greenery has been planted along the street-facing façades to protect privacy and prevent overlooking. And because the ground floor is a metre higher than the pavement, parked cars do not obstruct residents’ views. “These are the kinds of thoughtful interventions that subtly ensure a connection with the surroundings. You want to give residents a sense of security and privacy, while also appearing welcoming and open to the outside world. That is why the projecting concrete frames reach outwards, while the unavoidable, often unattractive technical installations on the roof have been clad in gold, like a crown on the building. Combined with careful material choices based on the colour palette of the surrounding area, the finished building sits beautifully in the streetscape,” Theunis concludes, emphasising that the work is not yet finished. “On 5 January, we will be starting phase 3. This phase involves the delicate demolition of the remaining A-wing in the central area, which will make way for an attractive courtyard garden. Next, the adjoining B-block will receive a new south façade, including an additional entrance to the campus’s central reception area. This will improve permeability across the site. Whether further work will follow to bring our masterplan fully to life remains to be seen, but in any case WZC Sint-Jozef will have a completely new look by summer 2026 and be ready for the future.”

Een zakelijke vraag aan Assar Architecten? Get in touch

Who worked on it

WZC Sint-Jozef in Lier

  1. care organisationDe Medemens

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectWZC Sint-Jozef
  • ThemeHousing with care close by
  • SubjectResidential care & nursing homes
  • CompanyDe Medemens
  • CompanyAssar Architecten
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.