The WiFinn residential initiative, a private housing project for 21 young adults on the autism spectrum, opened on 1 November in the centre of Beneden-Leeuwen. The complex was built for a specific target group, but client De Kernen has also considered the needs of a potential future tenant.

The project comprises two residential floors with a total of 24 units, all of which are essentially identical. 21 apartments are for residents, one has been converted into a staff base for 24/7 support, and two have been extended and enlarged to create two communal living rooms.
Clarity
The initiative began in 2016 with a dream shared by a number of parents who had joined forces in the WiFinn foundation. They were looking for a home for their children, who require specialised care and 24-hour support. The foundation got in touch with housing association De Kernen, and plans were drawn up to realise the project. Jacky Gerrits, chair of WiFinn and a parent of one of the future residents, says: “From the outset, we made agreements to provide clarity for us as users and for De Kernen as the client and owner of the building. The rent is fixed for the first five years, but the intention is for the tenancy to last at least 25 years.” Bas van Coolwijk, project supervisor at De Kernen, says: “That clarity is of course helpful for us too, but the brief to the architect was also clear: design a complex that we can convert into social housing apartments with a few simple modifications, should the tenant terminate the contract for one reason or another. The possibility of a future alternative use has already been taken into account through individual building services and utility connections. For the current target group, we have made additional modifications to prevent noise nuisance, and installed an extra camera system for security, partly in response to a strong request from the parents. There is also the option of installing a second lift and adding an extra connection between the bedroom and bathroom in the apartment.”

Construction team
Aannemersbedrijf P. van Leeuwen was involved at an early stage as the contractor, using a construction team approach. Director Cees den Otter says: “This construction team project is a good fit for our organisation. We deliver around 70-80 per cent of our projects through this approach. We value being able to contribute early in the process, advise the client on construction costs, help the architect develop the details and support the structural engineer with the structural design. And in this project, the building’s future users were also at the table. That was useful, because they provided valuable input too. For example, the electrical contractor was selected on the foundation’s recommendation. As main contractor, you are taking a bit of a gamble, but we had such confidence in them from the outset that we were happy to do so.”
Any issues were resolved at the monthly construction meetings and fortnightly technical meetings. Van Coolwijk says: “The architect, Markt 38 from Oosterhout, has more than 30 years’ experience with healthcare construction projects, and WiFinn also provided plenty of input. This meant we had a well-developed plan in place before construction began.
That helped us avoid having to make major changes during construction. We found the interim quality inspections useful. As the client, they give you a good overview of the work as it progresses.”

Proud
For site foreman Kees Middelkoop, it was a pleasant environment to work in, but not without its challenges. He started construction in November 2021 and was able to make his final round of the building at the end of October this year. “First of all, we had to deal with the after-effects of COVID-19, so staff availability was sometimes a challenge. We have more than seventy employees at our own company, so we can usually reassign people to keep work moving. For subcontractors, this sometimes caused bigger problems. The timely delivery of materials is a general issue, but we managed that well too, sometimes through a bit of ingenuity and improvisation. All in all, we completed the whole project on schedule. I’m quite proud of that.” Den Otter adds: “The utility companies really showed their best side on this project. People sometimes complain about utility companies, but they did an excellent job here. It’s worth saying so.”

Sustainability
Sustainability plays an important role in new-build projects, and this one is no exception. Van Coolwijk says: “The building is gas-free. There are 207 PV panels on the roof, making it energy-neutral. We have also installed heat pumps with underfloor heating and use mechanical ventilation with heat recovery (MVHR).”
The location, in the heart of the village among homes and close to the shopping centre, presented an additional challenge for the construction team. Middelkoop says: “We paid a lot of attention to keeping the site clean and tidy. There was hardly any disruption from parked cars. We even received compliments from local residents. That doesn’t happen very often.”
At the time of writing (6 October, ed.), the final work on the building is being completed. Those involved look back on a positive collaboration and a smooth construction process. Gerrits describes it as “a great time on site”. “It’s a fantastic project with a wonderful end result. There are always a few minor things, of course, but they’re not worth mentioning. I can’t think of how we could have done it better.”
Een zakelijke vraag aan P. VAN LEEUWEN? Get in touch
Who worked on it
WiFinn in West Maas en Waal
- main contractor
P. van Leeuwen - clientDe Kernen
- architectMarkt 38
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWiFinn
- SubjectResidential care & nursing homes
- CompanyP. VAN LEEUWEN
- CompanyDe Kernen
- CompanyMarkt 38