General

Exceptional living at Hof van Waal in Tiel

Text José MulderImage Burgland Bouw, Aedifica, Lengkeek Architecten en Ingenieurs BV en José Mulder

De entree van Hof van Waal, uitnodigend en toegankelijk. (Beeld: Aedifica)
De entree van Hof van Waal, uitnodigend en toegankelijk. (Beeld: Aedifica)

Independent living with 24-hour care nearby

A new complex has recently been built in the heart of an established neighbourhood in Tiel, bringing housing and care together. Developer Carebeek, property investor Aedifica and housing and care organisation Saamborgh joined forces. They looked beyond care needs, focusing above all on the housing preferences of current and future residents. The building had to meet today’s needs and those of the future. The result is a beautiful residential complex offering care on request: Hof van Waal. 

A nursing room on the ground floor. The decentralised ClimaRad unit is in the rear left. (Image: Aedifica)

Patrick van Beek, owner-director at property developer Carebeek, is particularly interested in developing property for social purposes. “There was a vacant school in Tiel. The site on Gasthuislingelaan is close to shops, a railway station and a hospital, so it is quite central. Research showed that there was also a need for suitable care housing in Tiel. We then bought the site with the intention of building care homes there.” Carebeek had previously worked with property investor Aedifica and housing and care organisation Saamborgh on a project in Almere. That three-way partnership called for a repeat. They agree that three parties are needed to deliver a good care facility: an investor, a developer and a care provider. Without all three, nothing gets off the ground. As in Almere, the three parties took responsibility for the site and discussed the options and requirements. 

The parties involved. From left to right: Arie Huigen, Martijn Mortier, Patrick van Beek, Gerwin Holland and Robert Kromhof. (Image: José Mulder)

A forward-looking vision

The need for housing for older people is no news. What is innovative is that Saamborgh focuses on homes where independent living is central, but where care can be provided immediately when needed. “In our vision, we separate housing from care,” explains Gerwin Holland, initiator and shareholder at Saamborgh. “We offer a clustered housing model. People rent an apartment where they can live completely independently. We provide 24-hour care at the location.” Hof van Waal is therefore not a standard care home. This vision fits current demand, but the model also works well for other residents. This makes the development highly flexible and therefore future-proof. 

Martijn Mortier, Manager Property & Development at Aedifica NV Nederland, adds: “We are attracted to the care provider’s vision. Naturally, we want to build sustainably in any case. Aedifica also takes a longer-term view, since we are entering into a long-term relationship with the user. In our developments, we always look at how energy consumption can be reduced further by applying even more sustainable building services concepts.

Every apartment has its own bathroom. (Image: Aedifica)

“In Tiel, we made an additional investment in generating energy on site. This further reduces the user’s energy costs. It is also important that the building is flexible enough for the future, so it can respond to changes and developments in the market. The design already offers a wide range of options to meet varied market demand, while also being flexible in its layout. This means it can easily be adapted if, for example, different users move in. That makes it more sustainable for us and therefore more attractive.”

Building on what was already there

Robert Kromhof, architect at Lengkeek ­Architecten en Ingenieurs BV, designed the building with colleague Tim Ras. It provides 38 homes across 3 floors. The third residential floor is under the roof, giving the building a modest, welcoming appearance. “Naturally, we want to build as sustainably as possible. That is also what the current regulations require. It starts with making maximum use of the existing green surroundings. Our design also retains the layout of the two entrances on either side of the school building. The existing access and parking have been maintained. This means the new building fits perfectly into the existing green surroundings. The meeting room and its terraces, as well as the apartments, offer views of the beautiful green surroundings, which is very pleasant.” 

A welcoming communal space has been created on the ground floor. (Image: José Mulder)

To meet the needs of different residents, apartments ranging from 26 to 45 m2 have been provided with every comfort. Each apartment has its own climate control unit, kitchen and bathroom facilities. The homes are suitable for single residents, but couples can live there too. There is a central meeting space on the ground floor. Several nursing rooms have also been created there for residents with high care needs. 

Beautifully situated in green surroundings. (Image: Lengkeek Architecten en Ingenieurs BV)

Designing from the inside out

Because this project puts living, rather than care, at its heart, it calls for knowledge and expertise. Ultimately, everything still has to work in practice. Holland says the project was not simply about stacking bricks, but above all about how to stack them.
“People often think from the outside in, when what matters most is the inside, the comfort of the home. If you later realise that a wall or window frame would have been better placed a metre to the left or right, it is difficult to put right. That is why, before construction began, we brought in Olea Zorgvastgoed, a specialist in the design of care facilities. During construction, they provided valuable input on the layout, how the care process would work and how to safeguard Saamborgh’s programme of requirements within this residential care setting. That covered everything from the floor plan and furnishings to lighting, calming colours and innovative, comfortable care furniture. Thought was given to matters such as positive stimuli, pleasant and functional lighting, and a practical but above all welcoming living room. A landscape architect also contributed. The garden was considered from the early planning stages, with fragrant flowering and growing plants.”

Hof van Waal under construction. (Image: Burgland Bouw)

The unexpected

They looked for a construction partner that, as Van Beek puts it, ‘delivers on what it promises’. “Burgland Bouw was the best fit for our plans. It had already proved to be a reliable partner that handles unexpected changes during the construction process well. It is in everyone’s interest to deliver a good building, and to do so on schedule,” adds Mortier. The extensive preparatory phase gave Burgland Bouw a clear picture of what needed to be done. Project coordinator Arie Huigen says: “All the requirements had been clearly identified, which was very important to us during the construction process. The downside was that many different parties were overseeing the work. That can feel a little uncomfortable at times, but in the end it enabled us to deliver a flawless building.”

One thing they had not anticipated was the invasion of ­Ukraine. This had considerable consequences for the price of some products, such as steel. “Price rises are always unwelcome, of course. A good partner discusses them with you. Because the collaboration was so transparent and open, we found a suitable joint solution to these rising costs. That is only possible when the relationship between the parties is good,” Huigen concludes. 

There is also a welcoming table in the communal space. (Image: José Mulder)

Barrier-free

The result is an attractive residential complex that does not immediately look like a care facility. Kromhof confirms: “The residential offer comes first here. It is not a care building, but a building where people live.” The extensive preparatory work has paid off. Van Beek says: “The collaboration worked exceptionally well. We all had the same goal in mind. Not only was the building designed to be barrier-free, the collaboration was barrier-free too.” 

Question about this story? Ask your question

Who worked on it

Hof van Waal in Tiel

  1. clientCarebeek
  2. clientAedifica
  3. clientSaamborgh
  4. architectLengkeek Architecten en Ingenieurs BV
  5. contractorBurgland Bouw
  6. decentraal klimaatsysteemClimaRad BV
  7. interior designOlea Zorgvastgoed

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectHof van Waal
  • ThemeHousing with care close by
  • SubjectGeneral
  • CompanyCarebeek
  • CompanyAedifica
  • CompanySaamborgh
  • CompanyLengkeek Architecten en Ingenieurs BV
  • CompanyBurgland Bouw
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.