Interiors

Breda, Amphia ziekenhuis | The new Amphia: care at the centre, disciplines brought together

Breda, Amphia ziekenhuis | The new Amphia: care at the centre, disciplines brought together

The new Amphia combines tertiary care with planned care. The new building, which opened at the end of November, brings disciplines together around areas of tertiary-care specialisation; the existing building, which is to be renovated, will be adapted to accommodate high-throughput procedures. Users had substantial input into the new-build process, say Olof Suttorp, Chair of the Executive Board, and Remco Djamin, Chair of the medical specialist company (MSB). “The buildings have been organised around the care they provide.”

The result is a modern tertiary hospital on a single site, with a prominent position in the region. Under Amphia’s new-build concept, the Langendijk site in Breda city centre will close in two years. The Oosterhout site will be redeveloped according to a concept yet to be determined. The existing building at Molengracht, which is connected to the new 80,000 m² hospital, will be converted by 2021 to accommodate high-volume procedures, such as cataract surgery and plastic surgery. These specialties will have access to a procedure centre in the existing building, with operating theatres of their own. Suttorp: “We deliberately chose to separate processes strictly. We are an STZ top clinical hospital providing care for 400,000 people. By dividing the organisation, we will be able to combine tertiary care and high-throughput care effectively in the future.”

Aligning care processes

The new hospital has been designed to group departments that work closely together. Patients no longer have to cross the entire hospital for appointments. Three buildings have been constructed around the intervention building, which houses the emergency department, intensive care unit, GP out-of-hours service and operating theatre centre. They are organised around the tertiary-care focus areas of Women, Mother and Child, Oncology & Lung, and Heart & Vessels. Djamin: “For the sake of quality and efficiency, it is best to be close to one another. By aligning care processes and literally organising teams side by side, specialists such as surgeons, radiologists, oncologists and pathologists can work together more effectively.” The new intervention building is equipped with largely identical operating theatres, which also fits with the new way of working. “The collective is more important than the individual; operating times can no longer be claimed. The operating theatre belongs to all of us.”

Olof Suttorp and Remco Djamin.

Capacity management

The new building has 527 single rooms, each with its own bathroom, meeting modern expectations and requirements around infection prevention, comfort, peace and privacy. Patients can order meals to their room, as can visitors; family members are welcome to stay overnight in the room. In line with the reduction in the number of inpatient days, the number of hospital beds is falling, while day treatment is taking on a greater role. Djamin: “The shorter the intervention time, the better the patient’s recovery.” The new building also provides space for new models of care centred on collaboration with regional care partners. Suttorp: “A great deal of inpatient nursing capacity is taken up by people waiting for a place elsewhere. The Hospital Control Center matches hospital discharges with capacity in nursing homes and makes these predictable, with the aim of improving patient flow throughout the care chain. We are also working on the possibility of offering beds for rehabilitation with relevant partners.”

Training and follow-up support

The MSB, which brings medical professionals together as a cooperative within the hospital organisation, has been closely involved in the transformation process from the development of the vision and adoption of the property strategy onwards. “The buildings have been clearly organised around the care they provide. Functionality is central, and that was understood from the outset. Users had substantial input, within budgetary limits, of course. Not many hospitals have the opportunity to organise care in this way,” says Djamin. Staff were prepared for the move and the new ways of working at the Amphia Academy. “Think of the transition from multi-bed rooms to single rooms. Previously, there was a central nursing station on the ward; now, nurses will need to visit the rooms more often.” To support this process, the nursing rooms are equipped with modern domotics, including personal alarms and fall detection, which nurses can monitor via an app.

The new building at Molengracht opened on 29 November in a so-called ‘big bang’. The emergency department opened at 8 am; during the day, around 400 patients moved from the existing Molengracht and Langendijk sites to the new hospital. “What we have learnt from rehearsing the move and from other hospitals is that users need good follow-up support during processes like this. They will receive support of this kind until March 2020,” Suttorp concludes.   

Question about this story? Ask your question

Wie aan Amphia Ziekenhuis Breda Molengracht werkte

  1. architectureWiegerinck architectuurMentioned in New-build Amphia Hospital Breda
  2. housingPTG AdviesMentioned in New-build Amphia Hospital Breda
  3. technical mattersDeernsMentioned in New-build Amphia Hospital Breda
  4. constructionABTMentioned in New-build Amphia Hospital Breda
  5. landscapeBosch & SlabbersMentioned in New-build Amphia Hospital Breda
  6. integrated consultancyPieterse terwel grevinkMentioned in New-build Amphia Hospital Breda
  7. Erwin Kersten (Van Wijnen)Van WijnenMentioned in Keys handed over as new Amphia hypermodern hospital is completed after three years of construction
  8. consortiumENGIE ServicesMentioned in Keys handed over as new Amphia hypermodern hospital is completed after three years of construction
  9. Construction consortiumFourCareMentioned in Keys handed over as new Amphia hypermodern hospital is completed after three years of construction
  10. architectWiegerinck architectuur en stedenbouwMentioned in Breda, Amphia Hospital | Amphia construction team: ‘Integrated bespoke solutions, thinking in 3D’
  11. door closersGEZEMentioned in Breda, Amphia Hospital | Door closers to operating theatre standard
  12. P&L deurconceptenLimburgia & PolvoMentioned in Breda, Amphia Hospital | Door closers to operating theatre standard
  13. architectWiegerinckMentioned in Breda, Amphia Hospital | Door closers to operating theatre standard

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAmphia Ziekenhuis Breda Molengracht
  • ThemeHospital construction and refurbishment
  • SubjectInteriors
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.