Significant reduction in energy demand in operating theatres

Text Dr. Drs. Ing. Jos Lans, Dr. Ing. Roberto Traversari MBA, Ir. Wim Maassen EngD, Ing. Gerbrand van Middelkoop en Drs. Sandra Lako Beeld Traversari MBA

Jeroen Bosch Ziekenhuis. (Beeld: Bert Rietberg)
Jeroen Bosch Ziekenhuis. (Beeld: Bert Rietberg)

Hospitals and other healthcare institutions in the Netherlands have signed the Green Deal for Sustainable Healthcare, committing to minimise waste, use less energy and take action to become more sustainable. By 2030, CO2 emissions must be at least 55% lower than in 1990, and by 2050 all healthcare organisations must be carbon neutral. The operating theatre department is one of the most energy-intensive departments in a hospital. Most operating theatres in the Netherlands have an air handling unit with a Class 1+ ultra-clean ventilation (UCV) system, which creates a carefully controlled airflow using a high number of air changes per hour. However, not all operations require an ultra-clean operating theatre.

APPROACH

This study was announced in the January 2023 issue of Bouwen aan de Zorg, and the first part of the study was published on 7 March 2024. This article presents the key findings from the second phase of the study. Between June 2024 and August 2024, measurements were taken of the air handling systems in nine operating theatres. These were operating theatres in three university hospitals, three regional hospitals and two private clinics. The temperature and relative humidity of the airflow were measured before and after the various components in the air handling unit, as was the power consumed by the fans. To determine the potential energy savings, a calculation model was used, with values derived from measurements as inputs. A baseline scenario was defined, and scenarios involving different measures were then modelled to determine the annual savings in energy demand. 

Figure 1C: Potential electrical/mechanical energy savings by scenario.

Baseline scenario

The potential energy savings from various measures were determined using a baseline scenario. This baseline was based on the survey results and measurements, and had the following characteristics: 57% of respondents set the relative humidity between 50-65%. The average outdoor air fraction (ODA) was approximately 2.700 m3/h and the total supply air volume (SUP) approximately 8.600 m3/h. The operating theatres in the baseline set had an average fresh outdoor air volume of 2.367 m3/h (min. 1.000, max. 3.000 m3/h) and an average supply air volume of 9.691 m3/h (min. 3.000, max. 15.129 m3/h). The baseline set comprised seven Class 1+ operating theatres and two Class 1 operating theatres. The average temperature of the air supplied to the operating theatre was 19,7°C (min. 19,0, max. 21,2°C), and the temperature rise in the operating theatres was 0,9°C (min. 0,0, max. 2,1°C). 

Figure 1B: Potential thermal energy savings for an ultra-clean and a conventional general-purpose air handling system for operating theatres when all scenarios are implemented.

Scenarios

The potential energy savings for various scenarios were determined in comparison with the baseline. The four realistic scenarios considered were:

1. Scenario A, widening the relative humidity limits[1]. The relative humidity range was changed from 50-65% to 30-70%.

2. Scenario B, switching to standby mode when the operating theatre is not in use, at night or at weekends[2]. Operating hours were changed from 00:00-24:00h, weekends on, to 07:00-18.00h, weekends off.

3. Scenario C, reducing the outdoor air volume (ODA)[3,4]. The ODA was reduced from the original design values to 1.000 m3/h during operating hours and 500 m3/h in standby mode and at weekends.

4. Scenario D, reducing the total supply air volume (SUP) delivered to the operating theatre[5]. The SUP was set at 3.000 m3/h (conventional operating theatre, Class 1).  

For the reduction in fresh outdoor air supply, the minimum required level in the Occupational Health and Safety Catalogue for inhalation anaesthetics was used. The wider relative humidity limits were based on the sustainability guidance from the Expertisecentrum Verduurzaming Zorg (EVZ): www.expertisecentrumverduurzamingzorg.nl/wp-content/uploads/2023/04/Verduurzamingskaart-Bevochtigingseisen-in-ziekenhuizen-V1.0.pdf. To change an operating theatre from Class 1+ to Class 1, the supply air volume was set at 3.000 m3/h. The assumption was that this airflow meets the requirements for a Class 1 operating theatre (air change rate ≥ 20 and ISO particle Class 7 in accordance with NEN-EN-ISO 14644-1). The model assumed that the temperature rise in the operating theatres would remain unchanged when the airflow was reduced (from Class 1+ to Class 1). 

Figure 1C: Potential electrical/mechanical energy savings by scenario.

This assumption means that the internal heat load is lower in a Class 1 operating theatre. In some cases, the supplementary heating used in Class 1+ operation to achieve the temperature difference may not be needed in a Class 1 theatre, resulting in additional energy savings. In general, procedures that can be performed in a Class 1 operating theatre generate a higher equipment heat load than those in a Class 1+ operating theatre. One point to consider is whether the cooling capacity will still be sufficient if airflow is reduced. In some cases, reducing the airflow may mean that the supplementary heating required for Class 1+ operation is no longer needed. This yields further energy savings. Supplementary heating is sometimes used to achieve the temperature difference needed for good airflow (between the supply air and room temperatures) or to improve comfort.

Results

Figure 1 shows box plots of the potential savings in both thermal energy and the fans’ electrical/mechanical energy consumption for the baseline set of hospitals if the scenarios are implemented. The potential savings are calculated relative to the baseline. 

Conclusion

Hospitals are already taking various measures to reduce the energy consumption of operating theatre air handling systems. Most hospitals use heat recovery systems to recover energy from the extract air. In addition, 80% of respondents already reduce airflow at night and at weekends.

There are several ways to save energy in existing operating theatres by modifying the air handling system. Energy savings can be achieved by reducing the outdoor air volume (ODA), switching the system to standby mode when the operating theatre is not in use, widening the relative humidity range (lower and upper set points), and downgrading the operating theatre classification from ultra-clean (Class 1+) to general (Class 1). Reducing the ODA has a significant energy-saving effect compared with the baseline. However, reducing the ODA in existing facilities is often not straightforward. The options must first be assessed in light of the technical design of the air handling system. 

Figure 1D: Potential savings in electrical/mechanical energy demand for an ultra-clean and a general-purpose air handling system for operating theatres when all scenarios are implemented.

Before modifying an existing ventilation system, it is important to understand how it is configured. In many hospitals, the primary ventilation system serves areas beyond the operating theatre, with other rooms in the operating theatre suite often connected to it. The growing demand for energy savings calls for an air handling system that can meet changing requirements.

Relatively straightforward energy-saving measures include widening the relative humidity limits, introducing operating schedules and downgrading the operating theatre classification. In this study, downgrading the operating theatre classification had the smallest impact on energy consumption compared with the defined baseline. A simple motion sensor can also be installed to reduce ventilation during the day when the operating theatre is not in use.

There is considerable potential for energy savings and for achieving the targeted reduction in CO2 emissions by implementing one or more of the measures described.  

References 1. TNO and TU/e, commissioned by NFU and NVZ. (2021). Humidification requirements in healthcare facilities: practical implementation. 2. Traversari, A. A. L., Bottenheft, C., van Heumen, S. P. M., Goedhart, C. A., & Vos, M. C. (2017). Effect of switching off unidirectional downflow systems of operating theaters during prolonged inactivity on the period before the operating theater can safely be used. American Journal of Infection Control, 45(2), 139-144. https://doi.org/10.1016/j.ajic.2016.07.019. 3. Schweizerischer Verein von Gebäudetechnik-Ingenieuren. (2015). SWKI VA105-01 Room air handling systems in medically used spaces SICC VA105-01. www.swki.ch. 4. DIN 1946-4: 2018-09. (2018). Ventilation and air conditioning, Part 4: Ventilation in buildings and rooms of health care. 5. Lans, J. L. A., Mathijssen, N. M. C., Bode, A., van den Dobbelsteen, J. J., van der Elst, M., & Luscuere, P. G. (2024). What is the effect of reducing the air change rate on the ventilation effectiveness in ultra-clean operating rooms? Journal of Hospital Infection. https://doi.org/10.1016/j.jhin.2024.02.007.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeSustainable healthcare buildings
  • SubjectSustainability
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.