Residential care & nursing homes

New Tusselerhof and Tusselerstaete: Pro Senectute can look ahead to at least another 30 years

Ontspanningsruimte.
Ontspanningsruimte.

“Look, isn’t this a lovely detail?” Rob Mombarg points to the floor in what is literally the space between Tusselerhof and Tusselerstaete. Neatly displayed there is a sign directing visitors to the latter apartment complex to turn left, while those visiting Tusselerhof care centre should turn right. It may be a small detail, but it is typical of the new buildings for care organisation Pro Senectute: an eye for detail.

And an eye for beauty, sustainability and durability, as we discover while walking around the buildings with Mombarg (technical commercial manager at main contractor KlaassenGroep) and Coryne Noordhoek (site manager of both Tusselerhof and Tusselerstaete). One example is the space between the two complexes mentioned above, which serves as both an entrance and a Grand Café. Looking up rather than down at the floor, we see an apparently random mix of slats nailed to the ceiling. This was not because Mombarg and his team had some left over, but at the request of architectural practice Oomen from Breda.

Noordhoek is site manager of both Pro Senectute locations (Latin for ‘for old age’). “Tusselerhof nursing home has room for 42 residents, while around 45 people live in the apartments at Tusselerstaete, some of them couples. There are around 125 people working here.”

Renovation not an option

The new building replaces the old Tusselerhof, a nursing home for around 60 residents. Noordhoek also managed that facility, as well as the Hoog Langen and Stadenbos residential complexes. “Pro Senectute has since sold those,” she says. The old Tusselerhof, built in the 1980s, no longer met requirements, and the specialists concluded that renovation was not an option either. Demolition and new construction were therefore chosen. “At the end of 2018, we moved temporarily to St. Joseph, an old care home for nuns. It wasn’t an ideal location and was quite run-down after being used for anti-squatting for a while, but after a refurbishment we stayed there for two years.” Meanwhile, the old Tusselerhof was demolished, and construction of the new building began in early 2019, with sustainability, more space for residents and luxury in mind.

Tusselerhof is home to people with ZZP package 5 or 7, providing residential care, nursing care and protected accommodation. Noordhoek says the services at Tusselerstaete are comparable to the sheltered housing of the past. “Residents live independently in their apartments and receive home care from us. They also have access to a package of services. We support them so they can function independently for as long as possible. We also offer them an activities programme. A host is on hand, and they can have a meal in the Grand Café four times a week.”

The library.

Art, culture and history

“This is a group of people who choose to live together. They are people who may have travelled extensively and enjoy conversations about politics and social issues. They have experienced a lot and feel engaged with society. In the final stage of their lives, they want more than traditional bingo. For example, we arrange a classical concert for them, performed by professional musicians. They enjoy art, culture and history. Another thing you see, for example, is that a partner with dementia lives at Tusselerhof while their partner without dementia lives at Tusselerstaete. That way, they can still live close to one another.”

During our tour of Tusselerhof, the inviting interior and attention to detail immediately stand out, such as the classical painting marking the entrance to the Hof Apartments. “It may be a nursing home, but everyone is welcome here, including people from the other part of the complex.” The ground-floor atrium has a beautiful tiled floor, plenty of woodwork and stylish chairs. There is lots of natural light. “It’s wonderfully sunny in here.” We pass a reminiscence corner with old-fashioned toys, and see the library and hair salon. “People may not remember exactly what a library is, and the hairdresser can’t do everything because there’s no water, but we still try to create a homely atmosphere. We have tools, craft materials and, for example, a sensory box containing familiar objects from the past.”

High standard of finish

“It really is a beautiful building, and its curved details create a wonderful look that fits the surroundings,” says Rob Mombarg, looking around with satisfaction. “The logistics took some thought, particularly because all the services have been neatly concealed in the generous crawl space and in the floors and walls. There are no suspended ceilings here.” Noordhoek points out another detail: alongside the apartment number and resident’s name, there is a photo frame by every door. “Residents can put something in it that they recognise, such as a photo or a print of a painting.”

Tusselerstaete also shows great attention to luxury and detail. The apartments here are spacious, and home automation systems come as standard. “Residents can decide for themselves which functions to switch on.” The staircase is a real eye-catcher, although most people naturally take one of the lifts to the first floor. There has been plenty of interest: “We recently welcomed the last couple.”

With the facilities installed, Pro Senectute can look ahead to at least another 30 years here. The buildings are also as sustainable as possible, with solar panels on the roof and heat pumps. Mombarg says: “Construction took a year and a half. Everything went very smoothly within the construction team, and with everyone willing to give and take a little, we achieved a great result within the set budgets. The exterior is all aluminium, concrete and brick, so it needs no maintenance. You invest a little more initially, but you more than recoup that later. The standard of finish is high, but that also suits the target group.”

FACTS AND FIGURES 

Project Tusselerhof and Tusselerstaete, Lochem
Client Pro Senecute Vastgoed, Amsterdam   
Architect Oomen Architecten, Breda
Contractor Klaassen Groep, Dinxperlo
Project management bbn adviseurs, Houten
Building services Rouweler Installatietechniek, Zelhem
Glazing and painting Van Dijk Glas en Schilderwerk, Leerdam
Care communications De Heer Medicom, Born   
Loose furniture Vervoort Meubelen, Goirle
Capacity 40 places for people requiring nursing home care, 31 apartments for people with low-level care needs

‘We used plenty of colour in the net curtains and curtains’

Fred van Kersbergen of Projectstoffering Utrecht is proud of what his team achieved in Lochem. “We supplied all the window coverings: net curtains, curtains and rails for the residents’ rooms, communal areas and living rooms. We based our proposals on the designs by Oomen Architecten.”

Van Kersbergen says his company won the contract because it offered the right balance of price and quality. “We submitted a tender and came out on top. We’re pleased that Pro Senectute has also immediately awarded us the contract to fit out De Wildhoef in Bloemendaal to the same specifications. We’ll be able to get started on that soon.”

Van Kersbergen is pleased with the result of the work in Lochem. “We used plenty of colour in the net curtains and curtains, with a different colour scheme on each floor. That makes every floor distinct. It’s great that Oomen Architecten came up with the idea and designed a cohesive whole.”

Projectstoffering Utrecht specialises in fitting out care projects, including flooring and window coverings. “At Tusselerhof, we only supplied the curtains, using fabrics from Artimo.”

Painting, glazing and wall finishes

“Good planning, good cooperation and, of course, the quality and availability of skilled staff.” Dirk van Dijk of Van Dijk Glas en Schilderwerk in Leerdam knows why his company is regularly brought in for construction projects by Klaassen Groep. “The staff know us, and we know them. We have a long-standing relationship, so we’re happy to make the extra journey.”

Lochem is not exactly close to home for the painters from Leerdam. “But this was a great contract, of course. We handled both the painting and the glazing and wall finishes, so there was a wide range of work. Among other things, we installed fire-resistant glazing and put up photographic wallpaper. We had worked all of that out and set it out clearly during the tender process. That meant we could hit the ground running and be involved throughout the construction process. That’s one of our strengths: thinking things through and supplying the right people and materials on time. That makes us a true construction partner for Klaassen Groep.”

Future-proof care technology

“A new, modern care complex calls for future-proof care technology that can easily adapt as care needs change.” The new Tusselerstaete and Tusselerhof locations are equipped with care technology from De Heer Medicom.

“At Tusselerstaete, Care4me units have been installed in the apartments where residents live independently, helping them to do so for longer. In addition to a touchscreen and video door-entry system, the unit has functions that monitor residents and help them with everyday activities,” says account manager Henk Wijnberger. “With Care4me, residents can use the video door-entry system to speak to visitors at the entrance and open the entrance door. Residents who need care can also raise an alarm using the button on Care4me or the supplied wireless neck or wrist pendant. A care professional can then respond to the alarm.”

At Tusselerhof, the setting is intramural, with nursing care provided, says Wijnberger. “The rooms have call units connected to wireless neck or wrist pendants. Care professionals have smartphones with the ANC Mobile Zorgapp, which they use to receive all calls, switch sensors on or off temporarily and establish two-way audio connections. The rooms also have smart sensors with video verification. When activity or inactivity is detected, the care professional receives an alert on their smartphone. This form of monitoring gives residents greater peace of mind, especially at night.”

Sometimes, a resident who wanders may unintentionally try to leave the care facility. “This can lead to dangerous situations. To prevent them, a wandering detection system has been installed. A neck or wrist pendant worn by the resident signals their presence at a specific door or passageway, and the door or passageway can be locked if required. Wandering detection gives the resident concerned greater freedom and privacy.” 

Home, but better!

For the new Tusselerhof and Tusselerstaete buildings, bbn adviseurs was responsible for the entire project management, as well as project direction and supervision during construction. bbn’s approach to providing housing for older people is based on the vision ‘Home, but better’.

“The location of Tusselerhof and Tusselerstaete is beautiful,” says Wilbert de Wit, who was project leader alongside Maaike Bondrager on behalf of bbn adviseurs. “Surrounded by nature and close to the lively centre of Lochem. What makes this project special is the perfect combination of housing and care. At bbn, we helped explore how best to achieve this combination, and we are proud of the result. Older people want to remain independent for as long as possible, but as they get older, their need for support increases. At Tusselerstaete, they have a comfortable apartment and can receive the care they need at any time. Partners can continue living under one roof when one of them needs additional care.”

Older people who feel better in themselves have lower care needs. “And people enjoy their work more in a comfortable environment. Living and working comfort is one of the four principles of bbn’s ‘Home, but better’ vision, which aims to create environments that improve older people’s lives.”

‘Refurbished materials and reuse are a good fit for this project, in which sustainability is a key pillar’

Inspiration in Furniture is Vervoort’s slogan. The Goirle-based company supplied the loose furniture for the communal areas and secure units at both Tusselerhof and Tusselerstaete. We deliberately do not say ‘new furniture’, as not all the furniture came straight from the factory. The striking orange chairs in Tusselerhof’s atrium, for example, had already been used once. “If something is still good, there’s no need to replace it straight away,” says Vervoort care manager Arjan Schipper. “Refurbished materials and reuse are also a good fit for this project, in which sustainability is a key pillar.” Interior designer Mischa Grijzen, who was closely involved in designing and furnishing the interiors on behalf of Vervoort, says: “As long as the materials are good and used in the right way, it works.”

According to Schipper, Vervoort was chosen to furnish the buildings because of the care it took with its presentation.
“We were able to convince our client with an original perspective. Apparently, we conveyed the right feel better than anyone else.” Grijzen adds: “I think we translated the ideas set out by the building’s architect into a style and colour scheme better than anyone else, creating a pleasing overall effect. Although it is a new building, we have managed to create warmth through the interior. Combining ease of use with minimal compromises on atmosphere is characteristic of our approach.”

Vervoort says: “It is, of course, a beautiful building in a stunning location, and we have reflected that in the interiors. We tried to bring the outside in, and succeeded. You can see that, for example, in the combination of the beautiful atrium floor and the furniture. The restaurant has also turned out really well and connects the two buildings. It will also be a place for socialising. The transition between the buildings is seamless, with the colours of the upholstery and furniture continuing throughout. The great thing is that each space retains its own identity.”

All-electric systems for Tusselerhof and Tusselerstaete

Rouweler Installatietechniek of Zelhem was responsible for the engineering, modelling and installation of the mechanical and electrical systems at Tusselerhof and Tusselerstaete. 

“Originally, the building was still going to be partly heated by gas-fired boilers, and the domestic hot water was also going to be heated using gas. This was changed to an all-electric system. Two reversible heat pumps now provide all the heating and cooling for the building. To heat the domestic hot water, we installed two heat pumps using CO2 as the refrigerant.” The electrical work included more: “We installed a 630 kVA transformer, as well as the fire alarm, paging and data systems. We also carried out the complete indoor and outdoor lighting plan. It was a great project, which we delivered in collaboration with Klaassen Groep.”

Een zakelijke vraag aan Vervoort Meubelen? Get in touch

Who worked on it

Tusselerhof en Tusselerstaete in Lochem, nieuwbouw

  1. Freestanding furnitureVervoort Meubelen
  2. clientPro Senecute Vastgoed
  3. architectOomen Architecten
  4. main contractorKlaassen Groep
  5. Construction managementbbn adviseurs
  6. building servicesRouweler Installatietechniek
  7. zorgcommunicatieDe Heer Medicom
  8. raambekledingProjectstoffering Utrecht

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectTusselerhof en Tusselerstaete
  • SubjectResidential care & nursing homes
  • CompanyVervoort Meubelen
  • CompanyPro Senecute Vastgoed
  • CompanyOomen Architecten
  • CompanyKlaassen Groep
  • Companybbn adviseurs
Share this article

Advertisement

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.