Hospitals

New hybrid operating theatre for Imeldaziekenhuis

In de nieuwe zaal staat het laatste nieuwe angiografietoestel van Philips, met de innovatieve Azurion Flexarm.
In de nieuwe zaal staat het laatste nieuwe angiografietoestel van Philips, met de innovatieve Azurion Flexarm.

At the beginning of September, the vascular surgeons at Imeldaziekenhuis in Bonheiden began using a brand-new hybrid operating theatre. It combines a high-tech digital operating theatre with an integrated medical imaging system. Imeldaziekenhuis took full responsibility for project management of the new-build project. “It was a deliberate choice,” says facilities director Stefaan Claeys.

Two years ago, the Imelda team decided to upgrade the hospital’s hybrid operating theatre. The first step was to map out all the functional and ergonomic requirements. “We soon concluded that the space available in the old operating suite was too small for modern, up-to-date equipment,” Claeys explains. “So we decided to build a completely new theatre next to the existing operating suite.”

Building from scratch offers several advantages. First and foremost, there is now literally room for state-of-the-art technology. Claeys: “The new theatre is equipped with Philips’ latest angiography system, featuring the innovative Azurion Flexarm. This allows doctors to visualise patients’ blood vessels with great precision.” The new equipment gives Imelda’s vascular specialists unparalleled image quality, while significantly reducing radiation doses, which is good for the health of patients and medical staff.

Room to work efficiently

A second advantage of the new operating suite is the space available, which allows medical staff to work comfortably. The Azurion Flexarm is ceiling-mounted and can be moved flexibly in any direction. This allows doctors to move the system all the way around the patient’s body without the surgeon having to move. All the necessary equipment is also available in the operating theatre itself. Previously, nurses had to leave the theatre repeatedly to collect equipment for the procedure from the operating suite’s storage area. This may seem like a minor detail, but having the necessary equipment to hand also affects how quickly a procedure can be performed. 

“The third advantage has everything to do with the high-quality, energy-efficient infrastructure for data, electricity and air conditioning,” says Claeys. “This infrastructure has been built entirely into the ceiling. The technology we have brought in and the project experience we have gained are helping to prepare our hospital for the future.”

Project management handled in-house

Apart from the structural engineering study for the new build, the Imelda team handled all the necessary design and preparation work, as well as project management, entirely in-house. “That was a deliberate choice,” says Claeys. “We coordinated the project ourselves and took on the role of design consultant, because this allowed us to build up expertise that we will very much need for future projects. One such project is a new cardiac lab for electrophysiology studies. The technology and infrastructure in a lab of this kind are comparable to those in our new hybrid operating theatre. We have gained a great deal of expertise from this first project, which we will soon be able to put to use again.”

Are there no drawbacks to handling the preliminary design work and project management in-house? “There are,” says Claeys. “A project like this is a learning experience, so you do not immediately have the experience needed to work quickly. Learning takes time. We had allowed 1 year to complete the new operating theatre. In the end, it took a year and a half, although the delay was mainly due to the coronavirus crisis.”

The hybrid operating theatre at Imeldaziekenhuis in Bonheiden.

Bringing requirements and possibilities together

“At the same time, managing a project in-house has a huge advantage,” Claeys continues. “You can align the expectations of end users, doctors and nurses, perfectly with the suppliers’ products and capabilities. Take the cabinets in the operating theatre, for example. We decided to fit them with electric roller shutters to save extra space. But that is not all: the lighting plan was also adjusted so that the inside of the cabinets is perfectly illuminated in all conditions. The result is greater ease of use for nursing staff.”

He concludes that the new operating theatre was fitted out as a full construction project. “We held weekly site meetings attended by all the parties involved. Everyone worked together constructively and adjustments were made where necessary. In my view, this constructive approach is the key to a successful project.”

One contractor, from demolition to interior fit-out 

Poels nv, based in Halen, was responsible for the new build and interior fit-out of the new hybrid operating theatre at Imeldaziekenhuis. It was a particularly significant project for the interior specialist: for the first time, it acted as main contractor for the entire process, from demolition work to interior fit-out.

“There was initially a warehouse on the site, which we demolished,” says David Saenen. “We then prepared the site for construction, installed the pile foundations and built the structure that houses the hybrid operating theatre. The building has two floors and adjoins three façades. Connecting it to the existing buildings presented a number of technical challenges. Even so, we can look back on a successful project and a great collaboration with the client and the architectural practice.”

HASA-architecten from Mechelen designed the building. After completing the shell, Poels nv also supplied the interior fit-out for the operating theatre. “We delivered the building on a turnkey basis,” Saenen explains. “The only exceptions were the building services and, of course, the medical equipment, which came from other suppliers.”

The operating theatre interior was entirely custom-made. During the works, the Poels nv team consulted closely with doctors, nurses and facilities staff at Imeldaziekenhuis. “We continually adjusted things together throughout the construction process,” Saenen explains. “This approach meant we paid a great deal of attention to detail. We have made Imeldaziekenhuis’s hybrid operating theatre fit for today and tomorrow.”

And what does the future hold for Poels nv? “In any case, we have developed a taste for new-build projects,” Saenen concludes. “We look forward to the next complete project we can deliver.”

Operating theatre built from modular, pre-engineered components 

An operating theatre is not just any building: it must meet the strictest standards and requirements to provide a clean working environment. ABN Cleanroom Technology from Munsterbilzen supplied the air-handling systems for the new hybrid operating theatre at Imeldaziekenhuis in Bonheiden.

“We specialise in cleanrooms,” CEO Jo Nelissen begins. “For the new operating theatre at Imeldaziekenhuis, we used our pre-engineered VIX concept. It is a pre-developed, modular system with standardised building components.” The main advantage of a modular, pre-engineered concept of this kind? Whatever the setting, it enables you to build a cleanroom with the same durability, reliability and ease of maintenance. “Because we work on a modular basis, we can respond quickly if additional client requirements arise during the project. It is also entirely possible to expand the operating theatre later. That modularity is a major asset.”

Digital is the new normal

A modern hospital is an intelligent, digital hospital. That is why ABN Cleanroom Technology provided a secure data connection between the operating theatre and the cloud. “This means you can check the air quality in the operating theatre securely, at any time and from any location,” Nelissen explains. “You also receive an automatic alert if preset parameters are exceeded.”

Project approach: speed and modularity

Modularity is built into the pre-engineered VIX concept that ABN Cleanroom Technology used at Imeldaziekenhuis. The hospital also placed particular emphasis on speed of delivery. “Because the VIX concept is fully developed and we keep its components in stock, we were able to complete this project very quickly,” Nelissen concludes. “The collaboration with Imelda went very smoothly.”

A three-way partnership for the electrical installation 

Electrical installations in medical spaces such as operating theatres are subject to much stricter requirements than usual. EPA Stroomleiders has extensive expertise and experience in projects of this kind. Imeldaziekenhuis therefore chose this specialist from Oudsbergen.

Even minor defects in electrical installations in medical spaces can put the safety and health of patients and staff at risk. In addition to complying with the AREI, these installations must therefore meet the requirements set out in technical note TO13/IA. The requirements are strictest in an operating suite. “Electromagnetic interference is simply not acceptable during angiography,” says Jacky Dreesen of EPA Stroomleiders. “Under no circumstances may a device or electrical wiring disrupt the operation of sensitive equipment in the operating theatre. A patient’s treatment or examination must never be interrupted, and captured data must not be lost.”

This project involved a three-way partnership between EPA Stroomleiders, the Imeldaziekenhuis team and the suppliers of the electrical equipment. “No external design consultant was involved in the project,” Dreesen continues. “We made up for that by communicating in a structured way with the Imelda team and suppliers such as Philips. This approach is essential because a great deal of technology has to fit into a limited space, and the end result must be flawless.”

This direct communication has its advantages: it enables continuous knowledge-sharing and makes it possible to respond flexibly to the client’s expectations. “For example, we adjusted the lighting plan at the users’ request,” Dreesen concludes. “This means the open cabinets are also perfectly lit, while reflections on the many screens in the room are avoided. We also installed RGB LED lighting to help patients feel at ease during examinations.”

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeHospital construction and refurbishment
  • SubjectHospitals
Share this article

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.