From former bed ward to contemporary day treatment centre

The new Amphia Ziekenhuis in Breda opened in 2019. Once it was fully operational and patients had moved from the existing building to the new section, the time was right to refurbish the existing building. This was done in stages. At times, it required major renovation work; at others, a substantial facelift. In every case, the work had to stay within the set parameters.
Daylight, clear routes and a distinctive identity

In 2019, the refurbishment team put the first ideas on paper. The ground floor was designated for the new outpatient clinics and the psychiatry and dialysis departments. The existing reception hall was made more spacious and filled with light. The first floor was planned to house the outpatient clinics, treatment centre and laboratory. The second floor was fitted out with spaces for day care and short stays, including the on-call department and skills lab. The third floor houses offices designed around the New Way of Working. Finally, the two upper floors were adapted for rehabilitation care, to be provided by MARQ and Thebe.
Within the parameters
“It wasn’t as though we could put those first ideas down on a blank sheet of paper,” says Jasper Meijer, project director for the refurbishment. “There were several parameters we wanted to stay within. The spaces had to be suitable for new ways of working, for example. Users needed spaces that addressed the limitations they faced, ideally within the existing technical infrastructure. The plans had to be delivered within the set budget and their appearance had to fit the atmosphere of the new Amphia. ‘Daylight’, ‘a clear main structure and routes’ and ‘the same finishing materials’ were the key words.”
Bringing infrastructure and processes together

It was a puzzle to schedule the construction work so that all processes could continue with minimal disruption. “We wanted to move each department just once and avoid setting up temporary facilities,” says Hester Schuyl, refurbishment project manager. “How could we retain the existing structure, allow the contractor to work in phases and, at the same time, enable the new processes?”
Developing together
To find the best solution, the team worked with the users of each department as it was being fitted out. “We had set ourselves the goal of keeping the time between development, design and construction as short as possible,” says Meijer. “That encouraged everyone involved to commit fully. No unnecessary moves or lengthy temporary facilities, just working together on a concept that would be available to them in the short term.”
Striking a balance
“The challenge was to strike a balance,” adds Gerard Jacobs, refurbishment project manager. “Budgets and requirements were leading, but so were the wishes and expectations of the people who would be working there. They also wanted to see elements of the new Amphia reflected in their building. It was up to us to bring requirements, wishes and expectations as close together as possible.”

One particular challenge was refurbishing the fourth and fifth floors. These were earmarked for geriatric rehabilitation care, to be provided by two external organisations, each with its own ideas, concepts and funding streams. Meijer says: “It took quite a lot of effort to get both organisations to agree on the same concept. Their approach to care was also new to us. In rehabilitation care, everything is focused on getting people moving; in a hospital, everything is geared towards rest and recovery.”
A welcoming reception hall
The refurbishment also drew on new insights. “Work processes are particularly important in the treatment centre, for example,” says Schuyl. “Visitors arriving at Amphia now remain in the reception hall for as long as possible, only going to the department where they will be treated at the last moment. That may sound obvious, but until recently visitors were put straight into bed on arrival. That is now a thing of the past. Visitors stay as long as possible in the welcoming central hall, with facilities for coffee, meals and more, also for friends and family.”
A distinctive identity
The refurbishment is now in its final phase, and the team is pleased with the result. “Of course, there are areas for improvement,” Meijer readily admits. “We could have done better on sustainability. However, experience has shown that this can only be achieved if all parties are committed to it from the outset.” At the same time, the refurbished building looks as good as new. The design principles are evident throughout: daylight and views, orientation and routes, and a distinctive identity with green as the dominant colour, alongside shades of white, grey and natural wood. The treatment centre stands out for its focus on patients, who can use its lounges to recover briefly after a procedure.
Users have also been pleasantly surprised by their new working environment. “Some have said it feels as though they are working in the new section too,” says Jacobs. “And the large atrium, which will eventually look as though trees and plants are growing there, is still being developed.”
Question about this story? Ask your question