Luxury assisted living apartments in harmony with nature

In Wondelgem’s green lung, the former parkland of Kasteel Morek has been completely redeveloped. The result is a unique, stylish residential project comprising 35 assisted living apartments, in harmony with the natural surroundings.
Until recently, the supply of high-quality assisted living apartments in Wondelgem, a district of Ghent, was inadequate. When Stad Gent approached property developer Danneels to redevelop the site around Kasteel Morek, the decision was quickly made. The site nevertheless posed a challenge, as the castle’s parkland contains a distinctive collection of trees that had to be preserved as far as possible. “At the suggestion of Stad Gent, we brought in Bontinck Architecture and Engineering. With a number of impressive projects to its name, including the Ghelamco Arena of AA Gent, there was no doubt about its expertise,” says Wim De Meyer, PR and communications manager at Danneels. “Together with the parks department, urban planning, forest conservation, the safety service and the fire brigade, we determined the layout of three residential blocks, providing a total of 35 assisted living apartments.”

Wooded surroundings as a source of inspiration
Integrating the new buildings into the nature-rich site also provided the starting point for the design. “The choice of materials, colours and textures for the new buildings was entirely inspired by the surrounding nature. Our concept aimed to create an optimal dialogue between the new buildings and the woodland park,” says Camille Bergez, architect at Bontinck Architecture and Engineering. “The three blocks are built in Wienerberger’s Archipois Barn Bruin brick, a nuanced brick with a lively texture that references the leaves and bark of the trees in the parkland. The brown aluminium cladding adds elegant accents and, together with the large windows, reflects the green surroundings. Inside, we carried the colour of the exterior joinery through to the handrails.”

The residential units have one or two bedrooms and a spacious terrace. There is an underground car park beneath buildings A and B. Each building has a spacious, covered entrance. Blocks B and C also have a communal room with a cafeteria, which flows seamlessly into a covered outdoor area. Ease of access to the units and convenience for residents were central to the design. For example, all areas are step-free to ensure easy passage.
Sustainable character
The project’s green character is reflected in more than just its architecture. Forest conservation was an essential consideration during the design and construction phases. Part of the woodland has been replanted behind the new block to compensate for the section that was cleared. Some paths in the former parkland remain unpaved, forming a playful loop around the new buildings. Vehicles are kept off the site as far as possible. During construction, particular attention was paid to the impact on the trees. Special fencing protects the trees and their roots. The client and property developer also opted for sustainable technical solutions. The blocks are equipped with mechanical ventilation systems, air-to-water heat pumps and solar panels. The residential units have solar blinds to keep out the heat during the hot summer months. Some buildings also have green roofs.

Ingenious call system
To meet residents’ needs, all units have been fitted with a carefully designed emergency call system. There is an emergency button in the living room and bathroom, as well as on the doorbell control panel. Residents are also provided with a wristband they can use to call for assistance if necessary. In addition, all flats comply with Flemish standards, including requirements for the height of letterboxes and sanitary fittings.

Residentie De Wondel officially opened its doors on 1 July 2022. All residential units have now been sold and occupied. This is the ultimate proof of the exceptional quality and design that the partners involved sought to achieve with this project.

Question about this story? Ask your question
Who worked on it
- ClientStad Gent (Gent)
- ArchitectBontinck Architecture and Engineering (Gent)
- Main contractorDanneels (Brugge)
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral


















