Seventeen operating theatres on a new hospital campus

The impressive new hospital building of AZ Delta in Rumbeke (Roeselare) is nearing completion. VK Studio Architects, Planners & Designers was responsible for the architecture, while VK Engineering served as the engineering consultancy for structural and building services. Hundreds of workers are still active on site, but they are expected to have completed their work by the end of 2019.
An operating department designed around patients and staff

The working group opted for operating theatres with few pendants and exposed building services.
The ground floor will include a large operating department with seventeen operating theatres and an interventional suite for the radiology department. A working group of surgeons, anaesthetists and nurses helped determine how the department should be designed.
A hospital, a logistics building and a power plant, with a combined floor area of 120,000 m² on a 25-hectare site: this is the new hospital campus of AZ Delta. “The first plans date back more than 10 years, the first borehole was drilled 6 years ago, and this hospital campus will open next year,” says Tom Vandermeersch, project engineer for construction projects (electrical) at AZ Delta. “Behind an imposing red-brick façade are the entrance hall with reception and shop, as well as all the consultation rooms. The medical-technical services are grouped in the medical streets on the ground floor: dialysis, radiotherapy, nuclear medicine, radiology, traumatology, cath labs, emergency and the operating department.”

From the lounge, patients first go to these preparation bays.
An operating department designed around patients and staff
Main contractor Wycor-Jansen is delivering the project, with particular attention also paid to the operating department. The seventeen operating theatres, the interventional suite and the associated functional rooms for administration, toilets and storage, among other things, form the shape of the number ‘8’. They are divided into two equal blocks, consisting mainly of standardised theatres measuring 7 by 8 metres. Only the two hybrid theatres and the interventional suite for the radiology department are slightly larger. “Most operating theatres are paired, with a shared store in between. Patients are transported along an internal corridor, while equipment is delivered via a logistics corridor that runs around the operating department. The sets and waste ultimately pass through two interlocked pass-through cupboards,” the project engineer explains. “Patients go from the lounge to the preparation bays first, after which their beds are taken to the respective theatres. After surgery, they spend some time in the centrally located recovery area, which also includes four isolation rooms and separate rooms for children. Two large internal courtyards provide the department with the necessary natural light.”

Tom Vandermeersch and Marc Ternest, project engineers for construction projects at AZ Delta, in one of the operating theatres in the new hospital building.
Surgeons’ key requirement: a clear layout
A working group of surgeons, anaesthetists and nurses helped determine the layout of the operating department and its theatres. They opted for uncluttered spaces with few pendants and exposed building services, where all operations can be performed efficiently. A large image of a natural landscape on one of the walls brings a sense of calm to the operating theatre. The rest of the space features hygienic white solid-core walls and easy-to-maintain rubber flooring. “The standard theatres are equipped with two pendants, one for anaesthesia and one for surgery, an arm for a monitor and a Magnus operating table with a fixed base and a movable, replaceable tabletop,” Vandermeersch adds. “After extensive testing, Trumpf lights were selected, featuring shadow management and colour control, among other things. The standard services are integrated into a single panel, while the rest are installed separately. A large screen connected to a local PC displays the required data. Every room also has a workstation for the anaesthetist and a double workstation for the circulating nurse and surgeon, all equipped with a PC.”
Laminar-flow ceilings
While EEG was responsible for the electrical installation, THV Tribus was responsible for the HVAC and plumbing packages. “Clean air is essential in operating theatres, so the working group opted for laminar airflow in every theatre. The contractor installed laminar-flow ceilings measuring 3 x 3.6 m, providing an airflow rate of 13,500 m³ per hour,” says Marc Ternest, project engineer for construction projects (HVAC, plumbing) at AZ Delta. “This airflow supplies sterile air and removes unwanted particles. Given the large volume of air that must be conditioned to the required temperature and humidity, most of the extract air is recovered after filtration, depending on how occupied the operating theatre is.”
Question about this story? Ask your question
Who worked on the AZ Delta hospital campus
- architectVK Studio Architects, Planners & DesignersIn this story
- structural and building services engineering consultancyVK EngineeringIn this story
- Pilot contractorWycor-JansenIn this story
- electrical installationEEGIn this story
- HVAC and plumbingTHV TribusIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAZ Delta hospital campus
- ThemeHospital construction and refurbishment
- SubjectInteriors
- CompanyVK Studio Architects, Planners & Designers
- CompanyVK Engineering
- CompanyWycor-Jansen
- CompanyEEG
- CompanyTHV Tribus