WZC Oranje Nassau’s Oord | New build calls for a flexible approach

WZC Oranje Nassau’s Oord | New build calls for a flexible approach

It is February 2020, and the construction hoardings around the new nursing home at Oranje Nassau’s Oord in Wageningen have come down. Residents have moved from their rooms in the old part of the nursing home to the new building. Remco Hillen, team leader at WAM&VanDuren Bouwgroep, and Allard Eggen, Facilities Manager at Zinzia Zorgroep, look back with satisfaction on an intensive period of collaboration. The changing care landscape and cuts to funding during construction in particular presented a number of challenges.

oranje-nassaus-oord-foto-1-kopieren

Allard Eggen, Facilities Manager at Zinzia Zorgroep (left), and Remco HIllen, team leader at WAM&VanDuren Bouwgroep. (Image: Uitgeverij Gelderland)

The nursing home is situated on the beautiful Landgoed Oranje Nassau’s Oord. In 1898, Queen Mother Emma decided that her residence should become a sanatorium. Zinzia Zorgroep now provides accommodation at this site for 180 older people with dementia and/or complex physical health conditions.

Het nieuwe operatiecomplex van Nij Smellinghe met opvallend grote vensters.

The multifunctional space adjoining the main entrance hosts a range of activities. (Image: WAM&VanDuren Bouwgroep)

Energy-neutral

The original sanatorium was built in a semicircle, and Delft-based architects Mecanoo have echoed this shape in the two new, stylish buildings. The first is the arc-shaped building, which has been ‘attached’ to the old listed main building. A separate new circular building has also been created alongside it. The building is energy-neutral, with most of the heating supplied by wood chips from the estate. Solar panels, a heat pump and high-performance insulation ensure energy neutrality. The building is also equipped with the necessary building automation systems. For example, biodynamic lighting helps optimise residents’ day-night rhythms. Smart optical sensors monitor residents while respecting their privacy.

The new buildings have a total of 126 single rooms. (Image: Uitgeverij Gelderland)

Fresh air

The work took 18 months. The two new buildings opened in January 2020, after which WAM&VanDuren continued with the renovation of the old main building. Eggen explains why the new build was necessary. “The old facilities are no longer fit for purpose. The twin rooms with shared bathrooms in the old care building have been replaced by single rooms with en-suite facilities. We now have residential groups, each with nine residents sharing a communal lounge and kitchen. Another striking feature is the long galleries outside the rooms. For people with dementia, it is important to experience that, as in the past, they have to go outside to get somewhere. They can go indoors to the lounge, but if they want to use other facilities on the grounds, they go outside via the gallery. These facilities, including a shop, restaurant, library, physiotherapy room, experience room, laundry bar and hair salon, are located in a multifunctional space around the central entrance.”

Top right is the new arc-shaped building, bottom right the new circular building, and on the left the listed arc with the old (square) nursing home below it. (Image: Mecanoo)

WAM&VanDuren Bouwgroep was selected through the tender because of its extensive experience in healthcare construction and its flexible approach. Eggen: “The Plan of Approach, including its financial viability, was of course important, but we also wanted a contractor who understood the people we care for here.
Residents sometimes came to watch the construction, occasionally without being asked. As a builder, you need to be understanding about that. Constructing a care building in an existing care environment is very different from simply building an office. WAM&VanDuren Bouwgroep understood that perfectly.”

oranje-nassaus-oord-foto-4-foto-wamvanduren-kopieren

Each residential group has nine residents. They share a communal space with kitchen and lounge facilities. (Image: WAM&VanDuren Bouwgroep)

Flexibility

The initial designs date from a time when care providers had somewhat more financial leeway, but funding constraints meant the plans had to be revised, even during construction.
For example, the rooms were ultimately made slightly smaller, creating space for 14 additional rooms. The care landscape has also changed in recent years. For example, the average length of stay in a nursing home has fallen. As a result, there was no longer a need for a communal activity room, as activities now take place within the residential groups. This called for considerable improvisation from both the contractor and the client. Hillen: “We gave careful consideration to the changes and worked closely with the client. You need experience in a care environment like this to understand what is required. That is why our fortnightly meetings with the project team were important. Consultation, clear communication and close working relationships are crucial.”

Lessons learned

Alongside the positive experiences, both parties also have lessons to take away. Eggen points in particular to the preparation: “Next time, we will certainly consult the architect at an earlier stage. During construction, we realised that, partly because of the cost-cutting, we did not have enough space for the technical installations and our facilities components. These changes were made during construction, but could have been avoided by setting aside space during the preparatory phase. After all, you know that changes will be made during construction. Taking this into account creates the necessary room, both literally and figuratively.”    

Question about this story? Ask your question

Who worked on it

Oranje Nassau’s Oord in Wageningen, new build

  1. contractorWAM&VanDuren Bouwgroep
  2. architectural practiceMecanoo
  3. clientZinzia Zorgroep

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectOranje Nassau’s Oord
  • ThemeHousing with care close by
  • SubjectResidential care & nursing homes
  • CompanyWAM&VanDuren Bouwgroep
  • CompanyMecanoo
  • CompanyZinzia Zorgroep
Share this article

Follow on Bouwen aan de Zorg

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.