Residential care & nursing homes
‘It is good to live and work here’
Text Roel van GilsImage Van Aarle de Laat, Sint Anna

The façade of the new care home Sint Anna in Boxmeer bears the words ‘bonum est hic habitare’. The Latin text refers to Sint Anna’s religious background and means ‘it is good to live here’. Now that all the residents have moved in and the dust has settled, adding ‘et laborare’ to the façade might well have been appropriate. The new building represents a huge technological leap forward, making it a very pleasant place to work for staff too.
“A great deal of time was spent designing a way to accommodate the new care home Sint Anna in the historic buildings of the Sisters of Julie Postel,” begins Bart van den Hork of architecture practice de Witte Oss. “In the end, it proved far too complex to create an efficient building within the existing structures. So the decision was made to build a new facility in the ‘meadow’. Unlike the old buildings, the new one was designed from the outset as a care home. It is a building that can not only meet the changing demands of care over the next twenty to thirty years, but can even be converted into apartments or offices if a pill for dementia has been invented by then. That gives an idea of how far we have gone in making the complex flexible and multifunctional.”

Healing environment
The new care home has twenty residential groups, each with a central living room and eight residents’ apartments. “We developed a blueprint that allows two residential groups to be combined into a unit of sixteen homes,” explains Van den Hork. “We then chose a layout that allows us to accommodate ten of these units very efficiently across three levels, while keeping future flexibility in mind. The result is a highly efficient building with three strategically placed vertical circulation cores.” According to Van den Hork, the location also played a major role in shaping the design. “The care home is set in a beautiful rural landscape in the Maasheggen area by the Maas. Every home has a view of greenery, the garden or the surrounding landscape. Residents never look out at a blank wall, and enjoy plenty of daylight and greenery. A ‘healing environment’ at its best.”

A giant leap forward
And Melanie van Dorst, team leader at Sint Anna, can attest to that better than anyone. “Residents were a little apprehensive at first, because moving is incredibly disruptive for this group. And of course it was for us as care staff too. We find change difficult,” she says with a laugh. “Now, a few months on, everyone is delighted with the new living and working environment. The move from the gloomy old setting, with dark blue carpet and yellow reception desks, to this modern, fresh environment is a giant leap. The smaller residential groups, with eight residents instead of the twenty in each group in the old building, also bring much greater peace and make things easier to oversee. And the stunning view of the Maas from the balconies off the communal living rooms is a lovely bonus, of course.”

Positive feedback
The positive feedback from users is also a tribute to Van Aarle de Laat. “The project’s success is down to excellent collaboration between all the parties involved, from the architect and structural engineer to the building services consultant and contractor,” says Stijn van Osta, senior consultant at Van Aarle de Laat. The project management consultancy has been involved since the planning stage, commissioned by Stichting Sint Anna. “We carried out a feasibility study, worked out the financing and held the necessary consultations with local and other authorities to ensure the plans could be developed. We also took responsibility for overall coordination and quality control on site.”
Complex site constraints
Before any construction could begin on the Sisters of Julie Postel site, the entire site had to be disentangled and thoroughly investigated. “We had to resolve a great many issues,” acknowledges Van Osta. “It is an unusual location, right in the middle of the countryside. In addition to archaeological investigations, environmental surveys were carried out, and we liaised extensively with nature conservation organisations to minimise disruption to local flora and fauna. The site’s location by the Maas also meant that we were only allowed to excavate at certain times of year, under strict water board regulations. We are in a sort of basin with groundwater seepage issues. So we had to navigate all the regulations and the many stakeholders, but that is something we are well equipped to do.”

Freedom of movement zones
Sint Anna has also adapted effectively to its new premises. “As we have grown to a total of 160 homes, we admitted a relatively large number of new residents in a short time after the final phase,” says Van Dorst. “That was a challenge, as was moving the existing residents in three phases. Thanks to good coordination and communication, that went very smoothly too. Everyone has now moved, except for the Sisters. They will continue to live in one wing of the former main building. The new building means we are much better equipped to meet the growing complexity of care needs, both in terms of mechanical aids and innovative technologies. For instance, we use ‘freedom of movement zones’, which means there are no longer any ‘locked wards’. Instead, residents retain their freedom, with monitoring where needed and settings tailored to each individual. The technological progress is enormous and helps residents retain control over their own lives.”
The quality of the new care home has not gone unnoticed by the local community either. “We held an open day just before the final move, and it was extremely well attended,” says Van Dorst proudly. “We received lots of positive feedback and even recruited new staff as a result of the open day. That may be the greatest compliment of all to the parties involved.” The grounds are currently being further landscaped, and a bicycle shelter is also being built. “We hope to have everything ready for the grand opening on 28 May,” concludes Van Osta.
Construction period
· Contractor selection: April 2020
· Start of new build, phase 1: 31 May 2021
· Completion of new build, phase 1: 21 June 2022
· Demolition of building H: July to October 2022
· Dismantling of temporary accommodation: July to September 2022
· Start of new build, phase 2a: October 2022
· Completion of new build, phase 2a: 21 March 2023
· Start of new build, phase 2b: March 2023
· Completion of new build, phase 2b: January 2024
· Demolition of building J: August to November 2023
· Infrastructure works: November 2023 to May 2024
Een zakelijke vraag aan Berghege Heerkens bouwgroep? Get in touch
Who worked on Verpleeghuis Sint Anna Boxmeer
- ClientStichting Sint Anna, BoxmeerMentioned in New-build care home Sint Anna gives residents a good day, every day
- ArchitectDe Witte OssMentioned in New-build care home Sint Anna gives residents a good day, every day
- Construction adviceVan Aarle de LaatMentioned in New-build care home Sint Anna gives residents a good day, every day
- Interior designMartin CuypersMentioned in New-build care home Sint Anna gives residents a good day, every day
- Building services adviceKlictet AdviesMentioned in New-build care home Sint Anna gives residents a good day, every day
- Electrical installationsWelvaarts ElektroMentioned in New-build care home Sint Anna gives residents a good day, every day
- Ventilation unitsClimaRadMentioned in New-build care home Sint Anna gives residents a good day, every day
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSint Anna Boxmeer care home
- SubjectResidential care & nursing homes
- CompanyBerghege Heerkens bouwgroep